Install Refresh View All
Read All Unread All

Lynn Imaging

City of Cynthiana – Cynthiana Fire Station #1 Addition

10/31/2025: City of Cynthiana – Cynthiana Fire Station #1 Addition A 3216 sq. ft. One-Story Addition to the City’s Fire Station #1. The addition is of masonry construction (CMU with a brick façade) with two double stacked truck bays. The addition will include a new Break Area and ADA restrooms as part of an ICC 500 […]

West Shelby Water District – Saddlebred Pointe Phase II Waterline Extension

10/31/2025: West Shelby Water District – Saddlebred Pointe Phase II Waterline Extension Saddlebred Pointe Phase II Waterline Extension consists of installing approximately 805 L.F. of 8” PVC, SDR-21 and all other necessary appurtenances. Project Location: Simpsonville, Kentucky More Details

Jefferson County Public Schools – 2025-2026 Asbestos and Lead Abatement Maintenance Contract

10/31/2025: Jefferson County Public Schools – 2025-2026 Asbestos and Lead Abatement Maintenance Contract Work on this contract pertains to the removal of various asbestos and lead materials in schools. Project Location: Louisville, Kentucky More Details

West Shelby Water District – Simpsonville Marketplace Phase I Waterline Extension

10/31/2025: West Shelby Water District – Simpsonville Marketplace Phase I Waterline Extension This contract consists of installing approximately 315 L.F. of 10” D.I. waterline and all other necessary appurtenances. Project Location: Simpsonville, Kentucky More Details

City of Booneville – Sag Hollow Golf Course Cabins

10/31/2025: City of Booneville – Sag Hollow Golf Course Cabins Work is to include: Construction of two Cabins only with utilities stubbed 5’ outside of the buildings. Project Location: Owsley County, Kentucky More Details

CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing

10/31/2025: CCK-3187.10-1-26 Kroger Field Repairs 2026- Lower Bowl Concrete & Waterproofing • The Lower Seating repairs occur between stadium Gate 1 and Gate 4. • The work focuses on the precast concrete seating units at Row 1 through Row 51 in Section 1 through Section 11. • Repairs include removal and replacement of the waterproofing membrane […]

Mountain Comprehensive Health Corporation – MCHC – Pharmacy Drive-Thru Alteration

10/31/2025: Mountain Comprehensive Health Corporation – MCHC – Pharmacy Drive-Thru Alteration The project site is located at 226 Medical Plaza Ln, Whitesburg, KY. The bid is to furnish all necessary labor, materials, tools, machinery, warranties, and all other items required to meet the plans and specifications. Work to include, but not limited to: Interior and exterior […]

Laurel County Board of Education – Laurel County Day Treatment – Phase 2

10/30/2025: Laurel County Board of Education – Laurel County Day Treatment – Phase 2 The Phase 2 Project at the Laurel County Day Treatment campus in the Bush community is centered on renovation of the Existing Gymnasium and associated spaces. The main gymnasium will receive new windows, HVAC equipment, lighting and electrical fixtures, repaired flooring, and […]

DeSales High School – Innovation Center Addition

10/30/2025: DeSales High School – Innovation Center Addition DeSales High School will receive sealed bids for the furnishing of all labor and materials and the performance of all work required for the DeSales High School Innovation Center Addition. Project Location: Louisville, Kentucky More Details

CCK-3187.20-1-26 Kroger Field 2026 Repairs- Upper Bowl Concrete & Waterproofing

10/30/2025: CCK-3187.20-1-26 Kroger Field 2026 Repairs- Upper Bowl Concrete & Waterproofing PROJECT DESCRIPTION Includes: • Upper Concourse Concrete & Waterproofing Repairs. • Prepare and install a waterproofing membrane on the structural slab, stairs, and bridges. Work includes replacement of sealants. • Repair of concrete deterioration and rebuild the slab edge at concourse expansion joints. • Repla

Ed Monroe Water Line Extension – Pendleton County Water District

10/29/2025: Ed Monroe Water Line Extension – Pendleton County Water District The work to be bid upon is described as follows: • Approximately 9,200 l.f. of 4” water line and appurtenances. Project Location: Falmouth, Kentucky More Details

RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML

10/29/2025: RFB-115-26 RE-AD RFB-82-26 EEC-AML-24011AMLBAML Estimated Length of Project: (Substantial Completion) + 90 Calendar Days (Final Completion) Drainage from eligible works are located upslope of the citizen’s residence impacting the residence and yard area. A slide has also occurred on the slope behind/beside the citizen’s residence impacting yard drainage. This project addresses the slide removing a

Clark County Project Development Board – A/E RFP Documents

10/29/2025: Clark County Project Development Board – A/E RFP Documents The Clark County Project Development Board (PDB) proposes to construct a new judicial center to be located in Winchester, KY. The PDB invites interested architectural firms to electronically submit a Court of Justice Architect-Engineer and Related Services Questionnaire to the Administrative Office of the Courts. Project […]

Cawood Water District – US 421/KY 3001 Waterline Replacement – Contract 2

10/29/2025: Cawood Water District – US 421/KY 3001 Waterline Replacement – Contract 2 The project consists of replacing approximately 5,750 L.F. of 8″ and 3″ waterline, one pressure reducing station, and all necessary appurtenances along US 421 and KY 3001 in Harlan County. Project Location: Cawood, Kentucky More Details

RFB-26-009 Hazard CTC Repair/Replace Roofs

10/28/2025: RFB-26-009 Hazard CTC Repair/Replace Roofs Estimate: $3,356,018 Estimated Length of Project: 270 (Substantial Completion) + 30 (Final Completion) The project involves roof work at the Hazard Community and Technical College on the Heavy Equipment, Devert Owens, Walter Prater, and First Federal buildings. The Heavy Equipment and Devert Owens buildings will both have their existing roofs […]

Jefferson County Public Schools – Chiller Replacement – Jeffersontown High School

10/28/2025: Jefferson County Public Schools – Chiller Replacement – Jeffersontown High School The primary scope of work for this project is to replace the chillers and pumps serving Jeffersontown High School, including electrical upgrades required. Project Location: Jeffersontown, Kentucky More Details

Jefferson County Public Schools – Boiler & Chiller Replacement – Barret Traditional Middle School

10/28/2025: Jefferson County Public Schools – Boiler & Chiller Replacement – Barret Traditional Middle School This project consists of a central plant replacement at Barret Traditional Middle School in the Jefferson County Public School District. The existing gas-fired hot water boilers and chillers will be replaced along with all existing chilled water, hot water, and building […]

Morehead Utility Plant Board – Contract 4 – Old Water Treatment Plant Demolition

10/27/2025: Morehead Utility Plant Board – Contract 4 – Old Water Treatment Plant Demolition The primary scope of work includes the demolition of the existing water treatment plant and related appurtenances. Project Location: Morehead, Kentucky More Details

Hardin County Board of Education – Trojan Way Elementary School

10/27/2025: Hardin County Board of Education – Trojan Way Elementary School The project consists of a new two story Elementary School with a community storm shelter for the Occupants. The design capacity is for 800 students. The overall gross square feet footage is approximately 109,000 sf. Project Location: Radcliff, Kentucky More Details

RFB-112-26 Parks – EP Tom Sawyer-Pool and Recreational Bldg Upgrades

10/27/2025: RFB-112-26 Parks – EP Tom Sawyer-Pool and Recreational Bldg Upgrades Estimate: $1,665,279.00 Estimated Length of Project: 120 (Substantial Completion) + 30 (Final Completion) This project provides for the renovation of the existing men’s and women’s restrooms and locker rooms at E.P. Tom Sawyer State Park Pool and Recreation facility, Louisville KY The work scope will […]

City of Pikeville – University of Pikeville Bear Mountain Athletics Park Roadway Improvements

10/27/2025: City of Pikeville – University of Pikeville Bear Mountain Athletics Park Roadway Improvements This project consists of the City of Pikeville – University of Pikeville Bear Mountain Athletics Park Roadway Improvements. Project Location: Pikeville, Kentucky More Details

Southern Water and Sewer District – Water Treatment Plant Improvements REBID

10/27/2025: Southern Water and Sewer District – Water Treatment Plant Improvements REBID The work to be REBID is described as follows: CONTRACT 412-23-01, WATER TREATMENT PLANT IMPROVEMENTS Perform work at the Southern Water and Sewer District to improve function of existing equipment. Project Location: McDowell, Kentucky More Details

City of Somerset – Horse Soldier Gas Line Extension

10/27/2025: City of Somerset – Horse Soldier Gas Line Extension The project consists of installing approximately 8,640 L.F. of 8” HDPE natural gas main, along KY 914 via open trench and directional bore installation methods and all other necessary appurtenances. Project Location: Somerset, Kentucky More Details

RFB-117-26 Parks – Yatesville Lake Marina Replacement

10/27/2025: RFB-117-26 Parks – Yatesville Lake Marina Replacement Estimate: $12,026,552.00 Estimated Length of Project: 240 (Substantial Completion) + 30 (Final Completion) The project is a full replacement of the marina. The work includes replacing all walkways, frames and floats. Walkways will have concrete panels for surfacing. The head dock building will be replaced. Dock A – […]

Housing Authority of Cynthiana – HVAC Upgrades

10/27/2025: Housing Authority of Cynthiana – HVAC Upgrades The work to be performed consists of: a. Ductwork replacement b. Furnace replacement c. Installation of new AC with coil and condenser Project Location: Cynthiana, Kentucky More Details

Go to Link:
Install Lynn Imaging to Your Desktop

Drap and drop this Lynn Imaging link to your Desktop.

Close