RFB-32-26 EDU – KSB Greenhouse Classroom |
RFB-32-26 EDU – KSB Greenhouse Classroom
Estimate:
$195,549.00
Estimated Length of Project:
90 (Substantial Completion) + 8 (Final Completion)
This project consists of providing and installing a new greenhouse for the Kentucky School for the Blind Campus located at 1867 Frankfort Avenue, Louisville, KY 40206.
1.Green House kit ADA accessible with:
a.Polycarbonate walls/ceilings.
b.Lockable door.
c.Ventilation systems.
d.Shade Cover – mechanically controlled.
2.Added to the Green House kit:
a.Lighting & power tower for workstations.
b.Concrete pad for the green house.
c.Entrance concrete pad surrounded by chain-link fence with lockable gate.
d.Trench drain on both long side of the green house.
e.(1)water spigots for the hose/mister.
Project Location: Louisville