RFB-137-25 EEC-AML-23082AMLBAML-BIL |
RFB-137-25 EEC-AML-23082AMLBAML-BIL
Estimated Length of Project:
(Substantial Completion) + 120 Calendar Days (Final Completion)
The home and 2 acre area it sits upon is threatened by slide potential from the pre-law related highwall located on the property and will need to be contained by retaining walls and serviced by new drainage infrastructure. The plan calls for constructing a concrete block wall next to the house structure to secure the loose dirt and rock in that area. Further, down the property there is an exposed rock face that needs to be contained with highwall restoration netting and shotcrete application. Unstable trees (some greater than 3”), loose dirt, and rock will need to be removed as they pose a danger of sliding off the sheer face. There will be a subdrain installed along the length of the walls and it will be piped out of an existing drainage path. This drainage path will be upgraded with a new under road pipe and new rock ditch that discharges the water into an area that will be armored with erosion discharge material. Utility lines and structures may need to be relocated and this will be done in accordance with AML and utility company specifications.
Project Location: Pike County