RFB-101-26 EEC-AML-25022AMLMAML |
RFB-101-26 EEC-AML-25022AMLMAML
Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)
The primary slide abatement planned consists of a strip to rock with the sides transitioning back to the original ground. Combination Rock Ditch and Class II/III ditches are to be installed to control the drainage for the site. A Rock Toe Buttress will be installed to help stabilize the material that is placed in the waste area.
Project Location: Perry County