Install Refresh View All
Read All Unread All

Lynn Imaging

25-07 / Pre-Advertisement Contractor Meeting – Crescent Hill Water Treatment Plant Reservoir Cleaning and Liner Replacement

Tue, Feb 18, 2025 9:45 AM

25-07 / Pre-Advertisement Contractor Meeting – Crescent Hill Water Treatment Plant Reservoir Cleaning and Liner Replacement

Questions: Dakotah DeRoche

Meeting: Pre-Advertisement Contractor Meeting (Bid is coming!)
Bid#/ Project: Bid 25-07 – Crescent Hill Water Treatment Plant Reservoir Cleaning and Liner Replacement
Location: Louisville Water Tower; 3005 River Road, Louisville, KY 40207
Meeting Date/Time: February 27, 2025, 9:00 AM
Pre-Qualification Category: Heavy Construction – Plant Work

Louisville Water invites you to attend a Pre-Advertisement Meeting for the upcoming Bid 25-07, Project No. 16665 – Crescent Hill Water Treatment Plant Reservoir Cleaning and Liner Replacement. While not Mandatory, this meeting is highly encouraged for interested Contractors in Louisville Water’s “Heavy Construction – Plant Work” pre-qualification category as well as subcontractors who would support them.
Louisville Water intends to advertise the project for Bid soon. The project involves comprehensive work on the Crescent Hill Reservoir, including draining each basin, managing water treatment residuals (WTR), and ensuring proper disposal of all materials in compliance with federal, state, and local laws. Additionally, the project includes the demolition and disposal of the existing flexible membrane liner system, preparation and concrete repairs of the reservoir base and slopes, and installation of new elastomeric geomembrane liner system.
WTR Management Services is a significant portion of the Work. The Contractor will be required to dredge, pump, or remove solids from the basins, dewater, process, haul and Beneficially Reuse the WTR. Prior to signing the Contract, Louisville Water will require the Contractor to provide the intended disposal method(s), the intended disposal location, and proof that the Contractor has obtained all necessary Beneficial Use permits. Louisville Water understands the time required to obtain Beneficial Use permits. As such, this meeting will serve as a call for interest and opportunity to learn sufficient information to begin the permit process.

We look forward to seeing you at the Pre-Advertisement Meeting and discussing this important project to renew our critical infrastructure.

Click Here for the List of Prequalified Bidders

Project Location: Louisville, Kentucky

More Details

Go to Link: https://www.lynnimaging.com/bids/2025/02/18/25-07-pre-advertisement-contractor-meeting-crescent-hill-water-treatment-plant-reservoir-cleaning-and-liner-replacement/