RFB-25-26 23091 AMLBAML AML Project |
RFB-25-26 23091 AMLBAML AML Project
Estimated Length of Project:
(Substantial Completion) + 180 Calendar Days (Final Completion)
Debris from a refuse fill (already lubricated by portals on the hillside) washed out during a rain storm and dumped material into the yard of a resident. This material disrupted drainage throughout the hollow along Scrapshin Branch Road and damaged the entrance to another residence. The proposed project consists primarily of installing pipes and ditches to restore proper drainage and constructing a gabion retaining wall to stabilize the hillside below the upper residence.
Project Location: Letcher County