RFB-75-27 DMA – LEITCHFIELD RC ROOF |
RFB-75-27 DMA – LEITCHFIELD RC ROOF
Estimate:
$198,363.00
Estimated Length of Project:
90 (Substantial Completion) + 30 (Final Completion)
The goal of this project is to re-cover the existing 2-ply modified bitumen asphalt roof with new cover board and a new 2-ply modified bitumen asphalt roof system. The existing roof will have wrinkles removed prior to the new gypsum roof cover board and roofing. All new prefinished metal coping caps, Scuppers, Downspouts, metal roof splashes, flashings, accessories, and terminations are included.
Project Location: Leitchfield