Site Visit Information
August 13, 2024 11:00 A.M. Eastern Time Jolly Building Room 201; 1 Community College Drive Hazard, KY 41701
Description
Estimate:
$3,664,994.00
Estimated Length of Project:
365 (Substantial Completion) + 30 (Final Completion)
Project is for the replacement of HVAC systems and equipment in various buildings as follows:
Walter Prater Building: Conversion from water loop heat pump system to Self-contained AC Units with Energy Recovery “BARD” type units in each classroom. Office areas will be served by VRF based system. All areas will receive new lighting and ceilings. In lower level, walls will be removed in old kitchen areas to make a large open space. Addition of restroom and scrub area in lower level. Door closers will be installed on all doors in corridors throughout building.
Heavy Equipment Building: Project includes the HVAC replacement of existing multizone rooftop unit serving classrooms and miscellaneous areas with new VAV rooftop unit and VAV boxes. Larger garage workshop space will be equipped with a new rooftop unit to serve the space. In the workshop existing garage doors will be replaced with new insulated garage doors. Existing Federal Pacific electrical panels will be replaced with new panels in same location including the MDP.
Challenger Center: Replacement of evaporative cooler and related controls.
First Federal Building: Upgrade controls in three large rooms.