Lynn Imaging Planroom

Logo

Pewee Valley Fire Department Station 2

Order
 001
 T1.0
Cover Sheet
001-T1.0_Cover_Sheet.tif
 002
 C1.0
Architectural Site Plan
002-C1.0_Architectural_Site_Plan.tif
 003
 C1.1
Site Layout Plan
003-C1.1_Site_Layout_Plan.tif
 004
 C1.2
Grading Drainage And Erosion Control Plan
004-C1.2_Grading_Drainage_And_Erosion_Control_Plan.tif
 005
 C1.3
Details
005-C1.3_Details.tif
 006
 S1.0
Foundation Plan And Details
006-S1.0_Foundation_Plan_And_Details.tif
 007
 S1.1
Foundation Details
007-S1.1_Foundation_Details.tif
 008
 S1.2
Second Floor Framing Plan And Details
008-S1.2_Second_Floor_Framing_Plan_And_Details.tif
 009
 S1.3
Roof Framing Plan Details And General Notes
009-S1.3_Roof_Framing_Plan_Details_And_General_Notes.tif
 010
 A1.0
First Floor Plan
010-A1.0_First_Floor_Plan.tif
 011
 A1.1
Second Floor Plan
011-A1.1_Second_Floor_Plan.tif
 012
 A1.2
First Floor Reflected Ceiling Plan
012-A1.2_First_Floor_Reflected_Ceiling_Plan.tif
 013
 A1.3
Second Floor Reflected Ceiling Plan
013-A1.3_Second_Floor_Reflected_Ceiling_Plan.tif
 014
 A1.4
Roof Plan And Details
014-A1.4_Roof_Plan_And_Details.tif
 015
 A1.5
Enlarged Plans And Interior Elevations
015-A1.5_Enlarged_Plans_And_Interior_Elevations.tif
 016
 A1.6
Enlarged Stair Plans And Sections
016-A1.6_Enlarged_Stair_Plans_And_Sections.tif
 017
 A2.0
Exterior Elevations
017-A2.0_Exterior_Elevations.tif
 018
 A2.1
Exterior Elevations
018-A2.1_Exterior_Elevations.tif
 019
 A3.0
Building Sections
019-A3.0_Building_Sections.tif
 020
 A3.1
Building Sections
020-A3.1_Building_Sections.tif
 021
 A4.0
Wall Sections
021-A4.0_Wall_Sections.tif
 022
 A4.1
Wall Sections
022-A4.1_Wall_Sections.tif
 023
 A4.2
Wall Sections
023-A4.2_Wall_Sections.tif
 024
 A5.0
Door And Window Types Schedule And Details
024-A5.0_Door_And_Window_Types_Schedule_And_Details.tif
 025
 A5.1
Enlarged Construction Details
025-A5.1_Enlarged_Construction_Details.tif
 026
 A6.0
Room Finish Schedule And Painting Plan
026-A6.0_Room_Finish_Schedule_And_Painting_Plan.tif
 027
 A6.1
Floor Finishes Plan
027-A6.1_Floor_Finishes_Plan.tif
 028
 U1.0
Site Utilities Plan
028-U1.0_Site_Utilities_Plan.tif
 029
 M1.1
Floor Plan Mechanical
029-M1.1_Floor_Plan_Mechanical.tif
 030
 M1.2
Mechanical Sections
030-M1.2_Mechanical_Sections.tif
 031
 M2.1
Mechanical Details Notes And Schedules
031-M2.1_Mechanical_Details_Notes_And_Schedules.tif
 032
 M2.2
Mechanical Details
032-M2.2_Mechanical_Details.tif
 033
 E1.1
Electrical Lighting Plans
033-E1.1_Electrical_Lighting_Plans.tif
 034
 E1.2
Electrical Power Plans
034-E1.2_Electrical_Power_Plans.tif
 035
 E1.3
Electrical Distribution
035-E1.3_Electrical_Distribution.tif
 036
 E1.4
Electrical FixtureSchedule And Details
036-E1.4_Electrical_FixtureSchedule_And_Details.tif
 037
 P1.0
Plumbing Plan Domestic Water And Gas First Floor
037-P1.0_Plumbing_Plan_Domestic_Water_And_Gas_First_Floor.tif
 038
 P1.1
Plumbing Plan Domestic Water And Gas Second Floor
038-P1.1_Plumbing_Plan_Domestic_Water_And_Gas_Second_Floor.tif
 039
 P1.2
Plumbing Plan Sanitary Waste First Floor
039-P1.2_Plumbing_Plan_Sanitary_Waste_First_Floor.tif
 040
 P-1.3
Plumbing Plan Sanitary Waste Second Floor
040-P-1.3_Plumbing_Plan_Sanitary_Waste_Second_Floor.tif
 041
 P-2.0
Plumbing Schedules Notes And Details
041-P-2.0_Plumbing_Schedules_Notes_And_Details.tif
 042
 P-2.1
Plumbing Risers
042-P-2.1_Plumbing_Risers.tif
 043
 FP-1.0
Fire Protection Plan First Floor
043-FP-1.0_Fire_Protection_Plan_First_Floor.tif
 044
 FP-1.1
Fire Protection Plan Second Floor
044-FP-1.1_Fire_Protection_Plan_Second_Floor.tif