Lynn Imaging Planroom

Logo

Rood and Riddle Equine Hospital New Pharmacy and Training Facility

Order
 001
 CS
Cover Sheet
001-CS_Cover_Sheet.tif
 002
 CMP
Campus Masterplan Reference only
002-CMP_Campus_Masterplan_Reference_only.tif
 003
 SS
Site Survey Drawing
003-SS_Site_Survey_Drawing.tif
 004
 1.0
Site Demo Plan
004-1.0_Site_Demo_Plan.tif
 005
 1.1
Grading and Drainage Plan
005-1.1_Grading_and_Drainage_Plan.tif
 006
 1.1a
Erosion Control Plan
006-1.1a_Erosion_Control_Plan.tif
 007
 1.1b
Sanitary Sewer Plan and Profile
007-1.1b_Sanitary_Sewer_Plan_and_Profile.tif
 008
 1.1c
Soil Erosion Control and Sanitary Sewer Notes
008-1.1c_Soil_Erosion_Control_and_Sanitary_Sewer_Notes.tif
 009
 1.2
Site Improvements Plan
009-1.2_Site_Improvements_Plan.tif
 010
 1.2a
Site Landscaping Plan
010-1.2a_Site_Landscaping_Plan.tif
 011
 1.3
Site Details
011-1.3_Site_Details.tif
 012
 1.3a
Retaining Wall Details
012-1.3a_Retaining_Wall_Details.tif
 013
 1.4
New Entry Gate and Driveway Expansion
013-1.4_New_Entry_Gate_and_Driveway_Expansion.tif
 014
 2.0
Structural Notes
014-2.0_Structural_Notes.tif
 015
 2.1
Foundation Plan
015-2.1_Foundation_Plan.tif
 016
 2.2
Second Floor Framing Plan
016-2.2_Second_Floor_Framing_Plan.tif
 017
 2.3
Roof Framing Plan
017-2.3_Roof_Framing_Plan.tif
 018
 2.4
Foundation Sections and Details
018-2.4_Foundation_Sections_and_Details.tif
 019
 2.5
Framing Sections and Details
019-2.5_Framing_Sections_and_Details.tif
 020
 2.6
Framing Sections and Details
020-2.6_Framing_Sections_and_Details.tif
 021
 3.0
Plan Notes and Details
021-3.0_Plan_Notes_and_Details.tif
 022
 3.1
First Floor Plan
022-3.1_First_Floor_Plan.tif
 023
 3.2
Second Floor Plan
023-3.2_Second_Floor_Plan.tif
 024
 3.3
Roof Plan and Attic Plan
024-3.3_Roof_Plan_and_Attic_Plan.tif
 025
 3.4
Reflected Ceiling Plan Notes and Details
025-3.4_Reflected_Ceiling_Plan_Notes_and_Details.tif
 026
 3.5
First Floor Refelcted Ceiling Plan
026-3.5_First_Floor_Refelcted_Ceiling_Plan.tif
 027
 3.6
Second Floor Refelcted Ceiling Plan
027-3.6_Second_Floor_Refelcted_Ceiling_Plan.tif
 028
 3.7
Door Schedule and Details
028-3.7_Door_Schedule_and_Details.tif
 029
 3.8
Window Schedule and Details
029-3.8_Window_Schedule_and_Details.tif
 030
 3.9
Room Finish Schedule
030-3.9_Room_Finish_Schedule.tif
 031
 F.1
Floor Finishes Plan
031-F.1_Floor_Finishes_Plan.tif
 032
 F.2
First Floor Furniture Plan Reference Only
032-F.2_First_Floor_Furniture_Plan_Reference_Only.tif
 033
 F.3
Second Floor Furniture Plan Reference Only
033-F.3_Second_Floor_Furniture_Plan_Reference_Only.tif
 034
 4.1
Building Elevations
034-4.1_Building_Elevations.tif
 035
 4.2
Building Elevations
035-4.2_Building_Elevations.tif
 036
 4.3
Building Section
036-4.3_Building_Section.tif
 037
 4.4
Building Section
037-4.4_Building_Section.tif
 038
 4.5a
Stair A section and Details
038-4.5a_Stair_A_section_and_Details.tif
 039
 4.5b
Stair B section and Details
039-4.5b_Stair_B_section_and_Details.tif
 040
 4.6
Elevator Shaft and Wall Sections
040-4.6_Elevator_Shaft_and_Wall_Sections.tif
 041
 5.1
Interior Elevations
041-5.1_Interior_Elevations.tif
 042
 5.2
Sterile Compounding Casework Elevations
042-5.2_Sterile_Compounding_Casework_Elevations.tif
 043
 5.3
Non Sterile Compounding Casework Elevations
043-5.3_Non_Sterile_Compounding_Casework_Elevations.tif
 044
 5.4
Casework Elevations
044-5.4_Casework_Elevations.tif
 045
 5.5
Casework Elevations
045-5.5_Casework_Elevations.tif
 046
 SU1.1
Site Utilities Plan Plumbing
046-SU1.1_Site_Utilities_Plan_Plumbing.tif
 047
 SU2.1
Site Utilities Plan Electrical
047-SU2.1_Site_Utilities_Plan_Electrical.tif
 048
 FP1.1
First Floor Plan Fire Protection
048-FP1.1_First_Floor_Plan_Fire_Protection.tif
 049
 FP1.2
Second Floor Plan Fire Protection
049-FP1.2_Second_Floor_Plan_Fire_Protection.tif
 050
 FP1.3
Attic Plan Fire Protection
050-FP1.3_Attic_Plan_Fire_Protection.tif
 051
 P1.1
First Floor Plan Sanitary
051-P1.1_First_Floor_Plan_Sanitary.tif
 052
 P1.2
Second Floor Plan Sanitary
052-P1.2_Second_Floor_Plan_Sanitary.tif
 053
 P1.3
First Floor Plan Domestic Water
053-P1.3_First_Floor_Plan_Domestic_Water.tif
 054
 P1.4
Second Floor Plan Domestic Water
054-P1.4_Second_Floor_Plan_Domestic_Water.tif
 055
 P1.5
First Floor Plan Gas
055-P1.5_First_Floor_Plan_Gas.tif
 056
 P1.6
Second Floor Plan Gas
056-P1.6_Second_Floor_Plan_Gas.tif
 057
 P2.0
First Floor Sanitary Riser
057-P2.0_First_Floor_Sanitary_Riser.tif
 058
 P2.1
Second Floor Sanitary Riser
058-P2.1_Second_Floor_Sanitary_Riser.tif
 059
 P3.1
Plumbing Details and Schedules
059-P3.1_Plumbing_Details_and_Schedules.tif
 060
 P3.2
Plumbing Details and Schedules
060-P3.2_Plumbing_Details_and_Schedules.tif
 061
 M1.1
First Floor Plan Mechanical
061-M1.1_First_Floor_Plan_Mechanical.tif
 062
 M1.2
Second Floor Plan Mechanical
062-M1.2_Second_Floor_Plan_Mechanical.tif
 063
 M1.3
Roof Plan Mechanical
063-M1.3_Roof_Plan_Mechanical.tif
 064
 M2.1
Mechanical Schedules and Details
064-M2.1_Mechanical_Schedules_and_Details.tif
 065
 M2.2
Mechanical Details
065-M2.2_Mechanical_Details.tif
 066
 E1.1
First Floor Plan Lighting
066-E1.1_First_Floor_Plan_Lighting.tif
 067
 E1.2
Second Floor Plan Lighting
067-E1.2_Second_Floor_Plan_Lighting.tif
 068
 E2.1
First Floor Plan Power
068-E2.1_First_Floor_Plan_Power.tif
 069
 E2.2
Second Floor Plan Power
069-E2.2_Second_Floor_Plan_Power.tif
 070
 E3.1
First Floor Plan Systems
070-E3.1_First_Floor_Plan_Systems.tif
 071
 E3.2
Second Floor Plan Systems
071-E3.2_Second_Floor_Plan_Systems.tif
 072
 E4.1
Electrical Legend and Details
072-E4.1_Electrical_Legend_and_Details.tif
 073
 E4.2
Electrical Details and Schedules
073-E4.2_Electrical_Details_and_Schedules.tif
 074
 E4.3
Electrical Schedules
074-E4.3_Electrical_Schedules.tif