Pre-Bid Information
05/31/2012 02:00 PM
Mandatory Pre Bid Meeting for all contractors
Description
The project scope includes the repair of the infield and approx. 20’ into the outfield at the Bryan Station High School Baseball Field. Demolition work includes removal of the existing infield soil and warning track to a depth of 5” along with the existing infield irrigation and piping system. Existing irrigation valve boxes in the infield and outfield irrigation will remain. Existing backstop pads and the artificial turf arc behind home plate will be removed, cataloged, and stored for reinstallation. Proposed work includes the re-grading of the infield with specific soil mixes for the seeded areas, skinned areas, pitcher’s mound, batter’s box, and the warning track. Proposed drainage repairs include a new infield under-drain system, drywell inlets with storm water collection chambers and associated storm piping, a junction manhole, new headwall and concrete flume. The infield will have seeded areas, new bases, pitchers plate, and anchoring systems set in concrete. The 20’ area of disturbed outfield will be seeded and the entire outfield will be over-seeded. Additional utility work includes replacement and raising of valves at the backflow preventer, a new hot box over the backflow preventer and a new concrete pad around the backflow preventer.