Briarwood Elementary School Addition
Briarwood Elementary School Addition
Bowling Green, KY
Briarwood Elementary School Addition
Bowling Green, KY
Contract 1 – Pump Station Expansion Area 2A Wastewater System Improvements
Expansion Area 2A Wastewater System Improvements
Contract 1 – Pump Station
Consisting of four 140 HP submersible sewage pumps, a carbon adsorber odor control system, a Bioxide chemical feed system for odor control, variable frequency drive motor controls, a standby electric power generator, ductile iron piping and valves, a cantenary coarse bar screen, concrete wetwall structure, building, and all associated labor, appurtenances, equipment, material and services together with all related work.
Lexington, KY
Frankfort Housing Authority
The project consists of:
Complete Demolition and Reconstruction of Unit Interiors, Foundation Stabilization/Repairs and Related Site Improvements.
Frankfort, KY
Isaac Murphy Memorial Art Garden Trail Head
The Isaac Murphy Memorial Art Garden Trail Head is a community park that will incorporate site amenities to encourage social gartherings and serve as a ‘starting point’ for The Legacy Trail at the east end of downtown. New curbs, sidewalks, seat walls, bike racks, water fountains, flagpoles, landscaping and an amphitheater will provide opportunities for visitors to enjoy the space as well as utilize it as a connection to The Legacy Trail.
The scope of construction involves removal of existing concrete walk, curb and gutter and construction of new site amenities and utilities. Included improvements are sidewalks, pavers, stone seat walls, storm drainage, site lighting and water line installation.
Lexington, KY
Bryan Station High School Baseball Field Repair
The project scope includes the repair of the infield and approx. 20’ into the outfield at the Bryan Station High School Baseball Field. Demolition work includes removal of the existing infield soil and warning track to a depth of 5” along with the existing infield irrigation and piping system. Existing irrigation valve boxes in the infield and outfield irrigation will remain. Existing backstop pads and the artificial turf arc behind home plate will be removed, cataloged, and stored for reinstallation. Proposed work includes the re-grading of the infield with specific soil mixes for the seeded areas, skinned areas, pitcher’s mound, batter’s box, and the warning track. Proposed drainage repairs include a new infield under-drain system, drywell inlets with storm water collection chambers and associated storm piping, a junction manhole, new headwall and concrete flume. The infield will have seeded areas, new bases, pitchers plate, and anchoring systems set in concrete. The 20’ area of disturbed outfield will be seeded and the entire outfield will be over-seeded. Additional utility work includes replacement and raising of valves at the backflow preventer, a new hot box over the backflow preventer and a new concrete pad around the backflow preventer.
Lexington, KY
2239.01 PCF Office Repurpose Hydrotherapy Conference Room
This Contractor shall furnish all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary to refurbish the temporary construction offices in the hospital basement for use as office space and supply and distribution. In addition, to convert 6th floor treatment room into Hydrotherapy space for the Patient Care Facility at the University of Kentucky. Also, to construct (2) small conference rooms in existing basement shell space.
The Scope of Services for these three (3) small projects is described in the following documents and drawings:
• Project A – Re-Purpose Basement Offices Drawing # A101 Rev. 4, dated 5-22-12, RE-purpose Basement offices.
• Project B – Modifications to Hydrotherapy, from GBBN Architects written description of the modifications to Hydrotherapy and as shown on Architectural Sketches ASK-01, ASK-02, and ASK-03 and as shown on Affiliated Engineers, Inc. Request for Quote memorandum (2 pages) including sheets MSK-01, MSK-02, ESK-01, ESK-02, PSK-01 and PSK-02.
• Project C – Basement Office Conference Rooms Drawing # A201 Rev. 1, dated 5-22-12, and itemized on Affiliated Engineers, Inc. Request for Quote memorandum (2 pages) including sheets MSK-01, ESK-01, FPSK-01 and T-COM-01
Lexington, KY
Wastewater Treatment Plant Improvements City of Monticello
The work to be bid is described as follows:
For the complete construction and furnishing of all items necessary to expand the existing Monticello Wastewater Treatment Plant utilizing the oxidation ditch treatment process as specified and/or shown on the Drawings, including all equipment and appurtenances, excavation, regrade, piping, site work, concrete work, electrical and control work, site demolition, and all other items of work (labor and materials) necessary for a complete and functional facility.
Monticello, KY
Request for Proposal a contract to furnish all labor, materials and other necessary equipment for an Elevated Mechanical Platform #2764
Louisville, Ky
CCK-1838-12 UKGS A030 Replace Electrical Gear UK
This project consists of the replacement of Electrical Gear in A030 of UKGS Hospital.
Lexington, KY
Living Arts and Science Center
Living Arts and Science Center
362 N. Martin Luther King Blvd.
Lexington, KY 40508
For questions please contact:
Burchfield and Thomas
Daniel Locke
Office: 859-231-6170
Fax: 859-254-5459
daniel@burchfieldandthomas.com
New Adair County Elementary School
Project consists of a 65,308 square feet new construction. The project includes sitework, concrete, masonry, structural steel, mechanical, fire protection and electrical.
Columbia, KY
Transylvania Glenn Building Renovation
Project Scope: This project consists of the interior renovation of the former bookstore space and lower level shell space into the Admission Office. The upper level will be subdivided into office and meeting space and the lower level will be subdivided into offices, open work room and workroom. The levels will be connected via spiral staircase. The existing MEP systems will be modified and adapted to these new space configurations. Interior finishes will consist of carpet tile, luxury vinyl, acoustical ceiling tile, painted gypsum board walls and wood trim.
Invited General Contractors Only:
Burchfield and Thomas Inc
BEX Construction Inc
Congleton-Hacker Company
Churchill McGee LLC
Jarboe Construction
LMR Construction
Lexington, KY
Lincoln Trail Sanitary Sewer Replacement
Installation of approximately 570 LF of eight-inch (8”), 1,434 LF of fifteen-inch (15”) and 334 LF of thirty-inch (30”) of sanitary sewer, 13 manholes and associated appurtenances.
Radcliff, Ky
Contract for District 24 Sidewalk Repairs Bost Ln and Bonaventure Blvd.
A price contract for Louisville Metro Government to supply a portion of their requirements for District 24 Sidewalk Repairs: Bost Ln. and Bonaventure Blvd.
Louisville, KY
Kurtz Avenue and Caven Avenue Sidewalk Repair
A price contract for a portion of Louisville Metro Government’s need for sidewalk repairs on Kurtz Avenue & Caven Avenue for a period of twelve (12) months.
Louisville, KY
US 25 Widening Detention Basin Rebid
The scope of work includes earthwork, dam and spillway construction, erosion control, the installation of storm sewers and appurtenances, and stabilization as shown on the Construction Plans. The site is located behind Clark Moore Middle School, north of Savannah Drive, and South of Bay Colony Subdivision.
Richmond, KY
Upper Bottom Water Line Replacment Project
The work replaces an aging 4″ water main with approximately 1,850 LF of new 6-inch PVC SDR-17 main. Also including approximately 45 residential meter reconnects.
Whitesburg, KY
Persimmon Ditch Bank Stabilization Project
The excavation and emergency stabilization of 9 locations of bank failure within the Persimmons Ditch corridor
Owensboro, KY
City of Frankfort Sewer Departemnt Vestibule Addition
Scope of Work
The city intends to issue a contract providing for the addition of a new Vestibule Entry to the Sewer Department Main Office at 1200 Kentucky Avenue. Existing storefront will be replaced and include addition of new curtainwall vestibule approximatley 9′-10″ deep by 14′-16″ wide footprint with roof structure up to 10′-0″ tall under existing exterior soffit. new curtainwall with include three new doors, and new sidewalk concrete. Work will include teh parital demolition and expansion of existing ramp, and removal and reinstallation of existing ramp handrails. Contractor shall be required to maintain the facility functions during all aspects of the construction. The contract and/or purchase to bid. The contract shall be provided in accordance with the stated specifications in Article IV- Proposal Specifications, and Article V- Technical Specifications, of this invitation. The City’s Purchasing Agent shall notify the successful bidder. After notification of the bid award to the successful bidder, the work specified by the bid package shall be coordinated with and installed as required by the City of Frankfort Sewer Department and the specifications.
Frankfort, KY
A price contract for a portion of Louisville Metro Government’s need for FY11-12 Capital Sidewalk Repairs for a period of twelve (12) months
Louisville, Ky
RFB-250-12
This work includes the construction of a 2,000 sf office building at 473 Highway 15 South, Jackson, KY 41339. The building is slab-on-grade with wood framed walls, vinyl clad double hung wood windows, R-19 batt insulation, shop –fabricated wood trusses, asphalt shingle roofing, and fiber cement siding. Typical floor finish to be vinyl composition tile, typical wall finish to be painted gypsum board, typical ceiling to be suspended acoustical tiles. Typical ceiling height to be 8’-0”, typical bearing wall to be 10’-1”. The HVAC system is an electric heat pump. The building will accommodate occupancy of 21 and house the following rooms and function: a large workroom with kitchenette, four private offices, a small conference room, men’s and women’s restrooms, mechanical room, custodial room, communications room, and reception room. The work also includes a small asphalt parking area, (1 space, accessible). Consult project description for information regarding connecting to site utilities.
Jackson, Kentucky
RFB-252-12
The project consists of metal roof replacement on the Dairy Barn. Tear off existing metal roofing, sheet metal, metal counter flashings and roof components as indicated. Repair and/or replace existing wood decking. Install one layer of rigid insulation, underlayment, new metal roof panels, and metal components. Remove existing roof vents, fabricate new matching existing, paint, and install.
Louisville, Kentucky
First Ward School Apartments Balance of Project Elkins WV
Restoration and renovation of the First Ward School Building into 16 Senior Living Apartments including eight 1-Bedroom units and eight 2-Bedroom units. Scope of Work includes sitework, concrete, structural, doors, windows, finishes, plumbing, fire sprinkler, HVAC, and electrical. Please see Plans and Specifications for complete Scope
Elkins, WV
First Ward School Apartments Asbestos Demo Elkins WV
Remove all asbestos containted materials as outlined
Dispose of all asbestos contaminated materials
Roofing asbestos is excluded from this Scope of Work
Elkins, WV