Walkertown MS Renovations Bid Package 2
Walkertown MS Renovations Bid Package 2
Hazard, KY
Walkertown MS Renovations Bid Package 2
Hazard, KY
Rose Island Road Water Main Extension Project
Louisville Water Company is requesting Bids for the referenced project consisting of the following: Furnish and Install 5,195+/-lineal feet of 12-inch PVC DR-18 C900 pipe, 165+/- lineal feet of 12-inch Pressure Class 350 ductile iron water main and 150+/- lineal feet of 12-inch Pressure Class 350 ductile iron restrained joint water main and appurtenances; installation of 6 fire hydrants; and to restore the site and all of the above shall be made ready for use in accordance and compliance with the Contract Documents. Pipe and pipe appurtenances will be supplied by the contractor.
Louisville, KY
DS related to NE Louisville Loop Multiuse Path Middletown Eastwood Trail MET Segment on US 60 between Old Shelbyville Rd to N. English Station Rd
Request for Qualifications for a contract for Design Services related to Northeast Louisville Loop Multi-use Path: Middletown Eastwood Trail (MET) Segment on U.S. 60 between Old Shelbyville Road to N English Station Road.
Louisville, KY
Irvine Housing Authority
Base Bid
HVAC Replacement – 1BR, 2BR, 3BR & 4BR Buildings (Wallace Circle) Replace existing condensate pump Replace concrete pads, thermostat wires & exterior disconnects Replace return air grill/filter and thermostats Install new GFCI outlet next to condensing unit Existing condensate lines and grills/registers to remain
Install New Parking (Wallace Circle) Install new parking Expand existing parking spaces to accommodate 2 cars per unit Add driveways in front of buildings without parking spaces
Alternate No 1 Install inter doors (Mt. Crest)
Alternate No 2 Install 1- 36” interior door (Mt Crest)
Alternate No 3 Install 1 cable/phone outlet (Wallace Circle)
Irvine, KY
Woodford Co HS Greenhouse Replacement
Versailles, KY
Contract 5 Water Main Extension Hardinsburg KY
The program of work for which bids are to be submitted consists of 185,939 lf of 8,6 and 4 inch water main and 1 booster pumping startion and all related appurtenances as shown.
Hardinsburg, KY
Contract 6 Stinnettsville Water Storage Tank Hardinsburg KY
The program of work for which bids are to be submitted consists of one 250,000 gallon elevated water storage tank including all related appurtenances.
Hardinsburg, KY
Longhorn Steakhouse — Mesa, AZ
The scope of work consists of a full restaurant ground up build. All mechanical trades will be required as well as glass/glazing, drywall/metal stud, rough carpentry, finish carpentry, tile, acoustic ceiling, painting, and roofing.
Mesa, AZ
Taylorsville Streetscape Phase 2
a. Remove and replace existing sidewalk 1400 SY
b. Stamping and staining of sidewalk 650 SF
c. Planter boxes 12 EA
d. Streetlamps 12 EA
e. Electric Panel 1 EA
f. Paving and striping 500 SY
Taylorsville, KY
RFB-108-12
The Project Scope of Work consists of a specified renovation to an existing Primary Historic Brick Structure, dating 1820’s with an 1854 addition, and a secondary Historic Smoke. The essence of the renovation is: Removal of an existing metal roof and installation of a new Historic Standing Seam Metal Roof. Replacement of a damaged section of the existing wood hip roof framing and replacement with new. Removal of existing damaged fascia/soffit and replacement with new. Replacement of existing box gutters and replaced with new per existing. Reworking existing and repairing existing damaged wood hung windows to be operable. Replacing and reworking existing wood floor framing and support columns. Minor existing exterior brick wall repair and miscellaneous tuck pointing. Interior finish scope of work including wet plaster patch, skimcoat and paint.
Louisville, Kentucky
Haley Pike Landfill Closure Phase 4 Earthworks
Phase 4 consists of construction a landfill cap system over the remaining 28 acre active portions of the site and various improvements to the previously capped areas. The landfill cap system consists of geocomposite gas vent layer, gas vents, 40-mil LLDPE geomembrane, geocomposite drainage layer, and 36 vegetative layer.
This bid is for the Earthworks
Lexington, KY
City of Frankfort Myrtle Avenue Gravity Sewer Rehabilitation Project
The bid package will consists of approximately 4,284 LF of sewer line rehabilitation. This bid package uses a combination of Cure In Place Pipe (CIPP) lining, HDPE installation via pipe bursting, and open cut repair. The Rehabilitation portion of the sewer pipe shall be televised using CCTV in accordance wwith PACP standards prior to the start of construction and post construction. Contractor shall be required to maintain flow during all aspects of the construction. The construction site shall be restored to preconstruction site conditions.
Frankfort, KY
Haley Pike Landfill Closure Phase 4
This contract consists of constructing a landfill cap system over the remaining 28 acrea active portions of the site and various improvements to the previously capped areas.
Lexington, KY
Contract 2 – Grant Co Improvements Phase 12
Approximately 6020 LF of 8″ PVC water line, 13 gate valves, 5 dry tap connections, 4 fire hydrants, 40 LF bores with steel encasement, 30 LF of open cut with steel encasement, directional bores, 160 LF of 8″ HD PE pipe, and all necessary appurtenances.
Bullock Pen Water District
Contract 1 – 500,000 Gallon Elevated Water Storage Tank
Construction of a 500,000 gallon elevated water storage tank, a prefabicated pump station including roadways, fencing, piping, valves, hydrants, generator, seeding, and all other necessary appurtenances.
Bullock Pen Water District
2338.0 Renovate/Upgrade Softball Complex
Construction of a new softball stadium, with 1400-1500 seats, press box, elevated concourse, toilet rooms, concessions area, elevator and various support spaces; The work includes foundations, steel structure, brick and concrete masonry, grandstand and seating systems, metal wall panel systems, TPO roofing system, glazing systems, finishes, mechanical and electrical systems; The facility is a Type 2B Construction per the KY Building Code.
1. Construction of a new Hitting Pavilion, with team locker room/shower facility, lounge and couches office; The work includes foundations, steel structure, brick and concrete masonry, metal wall panel systems, TPO roofing system, glazing systems, finishes and mechanical and electrical systems; The facility is a Type 2B Construction oer the KY Building Code.
2. Sitework associated with the above construction.
Lexington, KY
Liberty Housing Authority
Storm Door, Patio Doors, Windows, Fascia Trim, Guttering, Attic Insulation, Lighting
Liberty, KY
Germantown Streetscape Project Phase 2
Concrete Sidewalk Removal, 499 SY
Construct approximately 655 SY of concrete sidewalk
Other Misc. Improvements
Germantown, KY
RFB-253-12
The project consists of the remediation of several settlement cracks in the exterior
brick walls, interior cmu walls, and floor slabs in both the Residential Life Center (RLC)
and Unit Office buildings. The settlement in the foundations will be stabilized by
installing steel push piers at each building. Masonry walls will be repaired by replacing
brick/cmu and repointing joints. Floor slabs will be stabilized by mudjacking and
repaired using a cement based filler. All repaired walls and slabs will be repainted.
Earthwork will be required at the location of the steel push pier installations.
Dawson Springs, Kentucky
RFB-258-12
The work for this project consists of the restoration of 2,274 LF of Cranes Nest Branch, including but not limited to construction of in-stream structures, excavation of proposed channels and floodplains, reshaping of existing channels, native planting and seeding, preparation of soil for seeding, planting of trees and shrubs, installation of erosion control fabric and mulch, and harvesting, transporting, installing, and maintaining live stakes and rooted materials.
Knox County, Kentucky
RFB-254-12
This project consists of the addition of a 100 space asphalt parking lot and access road
including earthwork, limestone base, asphalt paving, pavement markings, sidewalks,
site signage and site lighting. Alternate #1 will include the upgrade of site lighting to
LED fixtures.
Dawson Springs, Kentucky
RFB-260-12
The Project consists of replacement of existing East Hall high-bay lighting. The existing high-bay 2’x4′ troffers shall be removed and turned over to owner as indicated on drawings. Existing emergency lighting fixtures shall be removed. Digital lighting controls for new lighting fixtures shall also be provided.
Louisville, Kentucky
Poage Elementary School Addition
The project scope includes the addition of 2 classrooms and renovation to the existing corridor connection and the existing bus loop canopy. The work must be substantially complete no later than July 30, 2012.
Ashland, KY
Click Here to View
Alumni Gym Addition
Furnish all labor and materials to complete the:
Ashland Independent Schools – Alumni Gym Addition
Ashland, KY
Briarwood Elementary School Addition
Bowling Green, KY