Hammer Tight Low Profile Bridge Replacement

Hammer Tight Low Profile Bridge Replacement

Carter Co, KY

Click Here to View

Redwing Drive Culvert Guardrail Design

Redwing Drive Culvert Guardrail Design

Winchester, KY

Click Here to View

RFB-15-13 Re-advertisement of RFB-54-12 Construct CERF-P Facility

RFB-15-13
The project involves new construction of an approximately 3,400 square foot building plus an additional 2,000 square feet as an alternate bid item. The primary structural systems are metal stud load bearing walls and truss roof framing. The roof consists of standing seam steel panels. Openings in the exterior include aluminum framed storefronts, sectional overhead garage doors, and hollow metal doors and frames. Steel siding and brick veneer is the exterior cladding material for the building. The interior finishes include ceramic tile, polished concrete, painted gypsum wall board, resilient wall base, and gypsom board ceilings. The mechanical system will include a high efficiency heat pump with heat recovery for fresh air intake. Electric unit heaters will be used in the garage portion of the building. The rest rooms include convential fixtures and in both mens and womens. In addition to building electric service, a generator transfer switch, and IT wiring and components are included.

Frankfort, Kentucky

click here to order

Shelbyville Road Main Replacement Project

Shelbyville Road Main Replacement Project

Louisville Water Company is requesting Bids for the installation of 730 linear feet of 16-inch DPW water main using traditional trench installation techniques, 390 linear feet of 16-inch DPW water main using the lay-in-place method, and 30 linear feet of 12-inch DPW water main using traditional trench installation techniques along Shelbyville Road between 15600 Shelbyville Road and 15712 Shelbyville Road. Also included with the project is the installation of 2 fire hydrants, the transfer/renewal of 2 customer services, and 2 service discontinues.

Louisville, KY

Click Here to Order

Wilson Range — Sanitary Sewer Main Extension

Wilson Range — Sanitary Sewer Main Extension

The work shall generally consist of : Installation of approximately 1530-LF of 8” sanitary sewer main and manholes, and including an 80-LF bore and jack of a 12” steel encasement pipe.

Louisville, KY

Click Here to Order

Liberty Elementary HVAC Upgrade and Renovation

Liberty Elementary HVAC Upgrade and Renovation

Liberty, KY

Click Here to View

Paris Cemetary Gate House Renovation

Paris Cemetary Gate House Renovation

This is a historic renovation project. Contractos must be qualified and have documented experience working on historic building projects.

Paris, KY

Click Here to View

EJMS Potable and Fire Protection Watermain

EJMS Potable and Fire Protection Watermain

The scope of work consists of, but it not limited to the following: approximately 6,257 linear feet of 10″ C-900 SDR 14 PVC and 579 linear feet of 6″ C-900 SDR 14 PVC water main and other appurtenances together with all related work.

Nicholasville, KY

Click Here to View

RFB-16-13 Interior and Exterior Renovation Military Museum

RFB-16-13
The Project consists of interior and exterior renovations to the historic State Arsenal building located at 125 Main Street, Frankfort, KY, for use as the Kentucky Military History Museum.
Interior Work: Rehabilitate the following rooms and spaces, complete including operational mechanical and electrical work and finishes. Exterior Work: Perform sitework including alteration of existing exterior concrete retaining walls, stairs, and sidewalks; and new asphalt, concrete, and unit paving, pipe railings, fences, and landscaping.

Frankfort, Kentucky

Click here to order

Parcel 606 Sewer Extension

Parcel 606 Sewer Extension

The project scope includes coring an existing manhole, placement of approximately 1,400 linear feet of PVC pipe, and installation of seven proposed manholes. Also included in the scope will be construction of an encased stream crossing and placement of an 8 inch diameter stub for future connection.

Winchester, KY

Click Here to View

Olive Hill Arts and Education Center

Olive Hill Arts and Education Center

Olive Hill, KY

Click Here to View

Bel-Air Sanitary Sewer Project

Bel-Air Sanitary Sewer Project

The project scope includes construction of approximately 2,509 linear feet of 15-inch gravity sewer line, 687 linear feet of boring 24-inch steel encasement pipe, and appurtenances.

Winchester, KY

Click Here to View

RFP for Professional Mechanical Engineering for New HVAC System at Mary T. Meagher Aquatic Center #2789

RFP for Professional Mechanical Engineering for New HVAC System at Mary T. Meagher Aquatic Center #2789

Request for Proposal a contract to furnish all labor, materials and other neccessary equipment for Professional Mechanical Engineering for new HVAC system at Mary T. Meagher Aquatic Center.

Louisville, KY

Click Here to Order

Route 582 AML Waterline Project Contract 21

Route 582 AML Waterline Project Contract 21

Contract 21 will consist of the construction of approximately 42,500 linear feet of 12 inch waterlines and the installation of two (2) booster pumping stations. The contractor shall furnish all materials, equipment and labor necessary to complete the construction of the waterline, appurtenances and reclamation.

Knott Co, KY

Click Here to View

RFB-12-13 Restroom Renovations National Guard Armory

RFB-12-13
The project consists of interior restroom selective demolition and renovation. Demolition includes removal of CMU wall construction, plumbing fixtures and showers. New restrooms consist of separate restroom and shower facilities for men and women within the existing building. New construction includes metal studs, drywall, ceramic tile, tile backing panels, toilet accessories, plumbing and electrical work.

Hopkinsville, Kentucky

Click here to order

Logan Co HS Athletic Fields Refurbishment

Logan Co HS Athletic Fields Refurbishment

The project includes base bid material and labor to remediate sink holes identified in plans, plow existing designated fields, disk the field four times, and drag the field four times. No significant cutting or filling is proposed for any portion of this project. Two alternates with include seeding and strawing the disturbed areas, and providing a new hose bib and water line to water the disturbed field areas.

Russellville, KY

Click Here to View

Morgantown Housing Authority Playgrounds, Outdoor Furniture and Parking Area

Morgantown Housing Authority Playgrounds, Outdoor Furniture and Parking Area

Modernization Project KY36P041-501(11)
Playgrounds, Outdoor Furniture and Parking Area

Morgantown, KY

Click Here to View

George Rogers Clark High School Phase 2: Area Technology Center

George Rogers Clark High School Phase 2: Area Technology Center

This project consists of the construction of an Area Technology Center built onto the Clark Co High School that is currently under construction. The new Area Technology Center will be approximately 41,000 SF. The building will contain standard classrooms and specialized lab spaces for Automotive, Welding, Health, Information Technology and Industrial Maintenance. The building is a one-story building with double height spaces for labs. Walls consist of CMU load-bearing construction with natural limestone and brick veneer. The roof will be a single ply thermoplastic roof system over lightweight concrete. Interior sinishes include painted CMU and gypsum board; ceramic tile, terrazzo, lay-in accoustical ceiling. The HVAC system will be tied into the existing geothermal well field.

Winchester, KY

Click Here to View

RE-AD OF RFB-260-12 East Hall Lighting Renovation Kentucky Exposition

RFB-14-13
The Project consists of replacement of existing East Hall high-bay lighting. The existing high-bay 2’x4′ troffers shall be removed and turned over to owner as indicated on drawings. Existing emergency lighting fixtures shall be removed. Digital lighting controls for new lighting fixtures shall also be provided.

Louisville, Kentucky

Click here to order

RFB-10-13 Exterior Wall Renovation Centralized Laboratory

RFB-10-13
The project consists of upgrades to a section of wall systems at the Centralized
Laboratory in Frankfort, Ky. The scope of work includes upgrade to wall components to
create a system which is airtight, water tight, and drainable. The work includes; metal
panel removal and reinstallation of metal panels, repairs and replacement of
sheathing, installation of an air barrier water barrier, new foam insulation, reseal
window gaskets, new sealant and water proofing and removal and reinstallation of all
interior finishes required to complete the work. Work shall also include sheet metal and
flashing at the second floor window system.

Frankfort, Kentucky

Click here to order

#2787 Custom Millwork at the Western Branch Library

#2787 Custom Millwork at the Western Branch Library

Contract to furnish all labor, materials, and other neccessary equipment for the Custom
Millwork to be installed at the Western Branch Library located at 604 South Tenth Street.

Louisville, KY

Click Here to Order

RFB-9-13 Supplemental Vehicular Guard System

RFB-9-13
Supplemental Vehicle Guard System – Lexington World Trade Center Garage Project is comprised of the following work on all levels of the garage.

1. Installation of bollards that are surface mounted to the garage deck.

2. Installation of supplemental vehicle guard systems between existing concrete columns at the garage northwest and southeast exterior walls.

3. Concrete column vertical extensions at the top level of the garage for installation of supplemental vehicle guard systems.

4. Installation of supplemental vehicle guard systems that are surface mounted to the garage deck at miscellaneous locations.

5. Alternate No. 1 – Installation of a supplemental vehicle guard system that is surface mounted to the garage deck at level 2.

The work will be performed in phases to limit closure of vehicle parking spaces. Specific limits on the number of vehicle parking spaces that may be closed in each phase are included to ensure the garage remains open for business

Lexington, Kentucky

Click here to order

Catnip Hill Pike 1.0 MG Elevated Storage Tank

Catnip Hill Pike 1.0 MG Elevated Storage Tank

Construction of a one-millions gallon capacity, torus bottom, steel, elevated water storage tank and appurtenances located in the Northwestern Service Area for the Jessamine-South Elkhorn Water District, Jessamine Co, KY. The work shall be completed in 300 days.

Jessamine Co, KY

Click Here to View

Addington Field Construct Apron Overlay and Associated Markings

Addington Field Construct Apron Overlay and Associated Markings

Elizabethtown, KY

Stonecrest Apartments

Stonecrest Apartments

Subcontractors only

Louisville, Ky