Wastewater Treatment Plant Expansion Town of Clarksville

Wastewater Treatment Plant Expansion Town of Clarksville

The scope of work includes the following major items:

1. New 18-inch and 36-inch influent sanitary sewers, including bore and jack under SR 62.
2. New influent pump station with six (6)-70 HP pumps equipped with VFD’s
3. New preliminary treatment building with new mechanical bar/filter screen, screening compactor, forced vortex grit basin, and grit dewatering system.
4. New Orbal oxidation ditch
5. Two (2) new 1O0-foot diameter secondary clarifiers
6. New RAS/IVAS pump station
7. New scum pump station
8. New odor control system
9. New chemical feed system
10. New UV disinfection system
11. Conversion of existing digesters to sludge holding tanks with new air and diffusor piping
12. New blowers to provide air to sludge holding tanks
13. New process water pump system
14. Reconditioning of one (1) existing sludge belt filter press and new sludge feed pumps
15. New sludge belt conveyor
16. New SCADA system for the new WWTP and 35 existing collection system pump stations
17. Electrical systems, including a new 1500 KW generator
18. I&C Systems
19. Demolition of selected structures and components of the existing trickling filter treatment plant
20. Other piping, structures, and appurtenances as required

Clarksville, IN

Click Here to Order

13-91 / Bullitt County Water Improvement Program Two-Thirds Majority Petition Nichols Hill Road and Ables Mountain Lane 4-Inch Water Main Extension

13-91 / Bullitt County Water Improvement Program Two-Thirds Majority Petition Nichols Hill Road and Ables Mountain Lane 4-Inch Water Main Extension

Louisville Water Company is requesting Bids for Furnish and Install 5,320 +/- lineal feet of 4-inch PVC Dr 18 water main, Furnish and Install 1815 +/ lineal feet 4 inch Ductile Iron Pressure Class 350 non restrained joint water main, Furnish and Install 65 +/-lineal feet 8-inch Ductile Iron Pressure Class 350 restrained and non-restrained joint water main, Install by jack and bore method 40 +/- LF of 16-inch steel casing pipe and appurtenances. Restore the site, all of the above made ready for use in accordance and compliance with the Contract Documents. All pipe will be supplied by the Contractor. Pipe appurtenances and steel casing pipe will be supplied by Louisville Water Company.

Louisville, KY

Click Here to Order

13-92 / Chilicoop Standpipe Demolition

13-92 / Chilicoop Standpipe Demolition

Louisville Water Company is requesting Bids to demolish a 200,000 gallon ground water storage tank and related accessories.

Louisville, KY

Click Here to Order

KRCC Dogwood Square Apartments

Kentucky River Community Care Dogwood Square Apartments

Separate bids for subcontract construction fo portions of Dogwood Square Apartments, including, but not limited to: (1) sanitary sewerage, (2) hot-mix asphalt paving, (3) masonry, (4) HVAC, (5) demolition and removal of existing 2,500 square foot residential dwelling and (6) electrical

Perry Co, KY

Click Here to View

Woodford County Public Schools BOE Emergency Generator

Woodford County Public Schools BOE Emergency Generator

Emergency Generator

Versailles, KY

Click Here to View

Woodford County Public Schools Asphalt Pavement Repairs

Woodford County Public Schools Asphalt Pavement Repairs

Asphalt Pavement Repairs

Woodford Co, KY

Click Here to View

13-90 / Lime Kiln Water Main Replacement

13-90 / Lime Kiln Water Main Replacement

Louisville Water Company is requesting Bids for the installation of +/-2,450 linear feet of 8-inch DPW water main along Lime Kiln Lane between River Knolls Road and Stoll Hill Road. Also included with the project are the installation of five fire hydrants, the relocation/renewal/transfer of eight customer services, and the installation of four residential customer service pressure-reducing valves. Mill and pave restoration of +/-21,120 square feet is required.

Louisville, KY

Click Here to Order

Idle Hour North Stormwater Improvements

Idle Hour North Stormwater Improvements

Stormwater Improvements

Lexington, KY

Click Here to View

Anchorage Public Schools 2013 Security Improvements

Anchorage Public Schools 2013 Security Improvements

Anchorage, KY

Click Here to Order

Housing Authority of Winchester Modernization Project KY36P018-501(12)

Housing Authority of Winchester Modernization Project KY36P018-501(12)

Sight/Hearing Conversions, Gas Meter/Valve Replacement, Accessible (Full 504) Unit Conversion, Repaving, Flooring Replacement & Concrete Walks

Winchester, KY

Click Here to View

Gateway Park Concessions Building REBID

Gateway Park Concessions Building REBID

Construction of a one-story 1,515 square foot wood framed building with wood roof trusses and concrete block foundation with future public restrooms and includes associated site work, general construction, plumbing, sanitary sewer, ventilation, and electrical.

Liberty, KY

Click Here to View

Barbourville Business Park Contract 2: Access Road and Turn Lanes

Barbourville Business Park Contract 2: Access Road and Turn Lanes

The contract consists of grading, drainage and paving for turn lanes on KY Route 225 and approximately 500 feet of industrial park access road.

Barbourville, KY

Click Here to View

Water Facilities Relocation KY 52-3 Garrard County KY

Water Facilities Relocation KY 52-3 Garrard County KY

Contract GCWA-KY52-3 – This contract consists of the relocation of existing water distribution facilities along the new alignment of KY 52 from KY 954 in Garrard County to neat KY 595 in Madison County, KY. The work includes relocation of approximately 20,000 LF of lines ranging from 2” to 8” and the associated appurtenances such as meters, fittings, valves, etc.

Garrard Co, KY

Click Here to View

US 60 Sidewalk Construction Project

US 60 Sidewalk Construction Project

The work to be bid upon is described as follows:
Concrete Sidewalk
Brick Paving
Various Storm Pipe and Structure Improvements
Concrete Curb and Gutter
Pavement Milling and Asphalt Surface
Landscaping, Streetlights & Street Furniture

Simpsonville, KY

Click Here to View

Martin County Goverment Center Demolition Package

Martin County Goverment Center Demolition Package

Demolition Package

Inez, KY

Click Here to View

Springfield – Washington Commerce Complex Building Site Preparation

Springfield – Washington Commerce Complex Building Site Preparation

The work consists of earthwork to create a compacted, earthen pad approximately 101,250 square feet in size in the Springfield-Washington County Industrial Park located on Highway 555, at the north Springfield city limits.

Springfield, KY

Click Here to View

City of Frankfort IT Building and Finance Department Roof Repairs and Misc Improvements

City of Frankfort IT Building and Finance Department Roof Repairs and Misc Improvements

Roof Repairs and Misc Improvements

Frankfort, KY

Click Here to View

Verity Middle School Chiller Relocation

Verity Middle School Chiller Relocation

Verity Middle School Addition/Renovation
Bid Package #1 – Chiller Relocation
2800 Kansas Street
Ashland, KY 41102

Click Here to View

Project MC6336 UK Hospital HD307 Angio UPS

Project MC6336 UK Hospital HD307 Angio UPS

Renovation of the UK Hospital HD307 Angio UPS

Lexington, KY

Click Here to View

East Jessamine High School Culinary Arts Room

East Jessamine High School Culinary Arts Room

Nicholasville, KY

Click Here to View

HA Hodgenville Waste-Line Replacements

HA Hodgenville Waste-Line Replacements

Hodgenville, KY

Click Here to View

RFB-221-13 Business Synergy Center Renovation

RFB-221-13
Estimate:
$298,080.00
This project renovates 3,800 square feet of existing space on the Second Floor of the North End of the Gray Building to create a Business Synergy Center. The Center will provide a series of interrelated spaces where participants learn business and collaboration skills that are known to be essential to successful business ventures.
This setting will project a professional business atmosphere that is key in this training experience. Interior finishes will reflect this approach.
The Center will be visible from the corridor through a glass curtainwall system. The central reception area will be open with glass partitions that offer visibility into all other areas and convenient access. The Center will consist of a tiered classroom for 24 students. This room will have fixed tiered seating with electrified tables for laptop computers, WiFi, and projection capabilities. An Ideation Room has a capacity 12 individuals with 3 walls covered with “white board” for discovery of ideas, outlining strategies, and organizational problem solving. A third space will be “the Board Room” which will provide professional setting for board room presentations and corporate role-playing.
Finishes will include mahogany panelling, glass partition, granite countertops. Floors will be carpet tiles. Ceiling will be 2×2 lay-in acoustical panels. Lighting will include a variety stage sets for the activities described above. HVAC will utilize new units to conform to the new layout.

Madisonville, Kentucky

Click here to order

RFB-2-14 Renovate Mignon Residence Hall

RFB-2-14
Estimate:
$7,346,159.00
This project, Renovate Mignon Residence Hall, will include a general renovation and upgrades to the facility. The upgrades will include the following: replacement of floor coverings, renovations of all bathrooms, kitchen, and lobby areas, elevator upgrades, masonry repairs, I.T. upgrades, window replacement, ADA accessibility, mechanical upgrades, and exterior drainage improvements.
The scope of work will include the redevelopment of a new entry focus and associated site work. Site work design is structured to create an enhanced approach and entry to the facility from the west façade of the building. The site work creates an outdoor patio area with new entry stairs leading to the building. A new ADA ramp is provided to allow for the facility to better serve the occupants that have mobility disabilities.
Also as part of the project, the overall exterior appearance of the building will be updated to match the other adjacent building in the complex with a new brick façade. The existing precast panels will be removed and replaced with a brick façade.
The renovation consists of replacing the plumbing fixtures in the residence rooms and installing new water heaters. New maintenance and drain valves are also to be installed. The steam-to-hot water heat exchanger will be replaced along with adding new HVAC units for the main lobby level and heat in the corridors. Rooftop units will provide exhaust and outside air for the facility. An alternate will replace the cooling tower.

Morehead, Kentucky

Click here to order

RFB-5-14 Oakwood Specialty Clinic Intermediate Care Facility

RFB-5-14
Estimate: $1,504,256.59
The project consists of new construction and renovation; the new construction
including general construction, mechanical, plumbing and electrical work. The work
entails and addition of approximately 7,500 square feet and renovation of
approximately 960 square feet of the existing building. The addition is a single story,
steel frame with metal stud walls and brick veneer, a shingle roof over nailboard
composite insulation and metal roof deck .

Somerset, Kentucky

Click here to order

Vine Grove Elementary Site Improvements

Vine Grove Elementary Site Improvements

Vine Grove, Kentucky

Click Here to Order