This restoration project is for the East side of the football stadium repairing all items necessary to waterproof, repair concrete, seal joints, drains, connectors as well as a plethora of repairs as outlined in the specifications and drawings.
City of Jamestown Russell County Regional Wastewater Treatment Plant
City of Jamestown Russell County Regional Wastewater Treatment Plant
This project is for the rehabilitation, repair, renovation, replacement and upgrading of a number of items including: concrete repairs, aeration basin valves, weir gates, yard piping valves, various pumps, various manual control valves, clarifier works, sludge thickener works, flow meters, pavement repairs, grading, CMU masonry block headworks building, belt filter press, mechanical fine screen, pump station modifications, floating surface aerators, power and electrical upgrades, building renovation, painting, site grading, concrete footings and foundations, concrete slabs and appurtenances.
Branscum Construction Company, Inc has been invited to submit a bid as General Contractor on the Texas Roadhouse in Somerset, KY. All questions on this project should be addressed to Jonathan Smith at Branscum Construction and not the owner.
Contact Person: Jonathan Smith
Phone: 270-866-5107
Please fax or email bids to (Fax) 270-866-6000 (Email) jsmith@branscumconstruction.com
Scope of Work: Construction of a new 6,762 sqft Texas Roadhouse Restaurant located at NWQ East US27 and Grand Central Blvd, Somerset KY.
Scope of work will require sitework, concrete, masonry, wood framing, roofing, doors & windows, interior finishings, sprinkler, HVAC & plumbing and electrical.
2366.0 Demolish Cooperstown Buildings A, B, C, F & G
2366.0 Demolish Cooperstown Buildings A, B, C, F & G
The buildings to be demolished are located along Cooperstown Dr., Lexington, Kentucky and consists of removing all structures, foundation walls, footings, landscaping, sidewalks, utilities, etc. as indicated and specified herein.
A. Physical Description of Cooperstown Apartments Buildings A, B, C, F & G
1. A 49,400 SF
2. B 23,300 SF
3. C 34,450 SF
4 F 42,000 SF
5 G 38,400 SF
Each are multi-story residence halls built on a partial walk-out basements. The structure consists of CMU bearing walls and steel joist floor and roof construction with brick veneer on concrete foundations. First floor and basement concrete slabs on grade.
B. Roofs: The original 1956 roof system was a slope built up membrane assembly, which is still in place. The current sloped shingle roof system was installed over top of the existing low sloped roof assembly.
C. Interior Construction: Exposed CMU walls and plaster ceilings with some areas of suspended acoustical tile ceilings.
D. Sidewalks and Porches: Concrete slabs on grade, remove as noted in documents. Walks to remain as indicated.
E. Attic: See note about roof addition above.
F. Foundation Walls: Cast in place concrete
G. Parking Lot: None
H. Trees and Landscaping: remove as noted in documents
I Elevator: None
J. PME Systems: To be removed in their entirety as indicated in the documents.
K Hazardous Materials: To be removed in their entirety as identified in the documents.
RFB-218-13 Window Replacement Hopkinsville National Guard Arm
RFB-218-13
Military Affairs
Estimate:
$ 96,656.00
The work includes removing existing aluminum window units and installing new aluminum insulated window units in existing rough openings. The work also includes removing storefront entry system and replacing with new blast mitigating aluminum storefront entry system.
RFB-217-13
Wendell H. Ford Regional Training Center
Estimate:
$160,000.00
This project, the Wendell H. Ford Regional Training Center, 2013 Metal Roof Retro-Fit Installation, located at 4675 State Route 181 N, Greenville, Kentucky in Muhlenburg County, shall generally consists of reroofing two separate structures which are alike in size/design and located in close proximity of one to the other. Each structure, approximately 9775 sq. ft. in area, has existing asphalt roofing shingles with underlayment which shall remain and have a new metal roof assembly consisting of continuous insulation/underlayment, metal furring hat channels and prefinished steel roof panels installed atop. The retro-fit work shall include certain associated work items such as selective demolition, minor framing improvements, incidental painting and miscellaneous sheet metal.
RFB-215-13 Waste Water Treatment Plant Replacement
RFB-215-13
Estill County Maintenance Garage
Estimate: $111,510.00
The work consists of the construction of approximately 638’ of 6” gravity sanitary
sewer, 226’ of 4” gravity sewer, sanitary sewer connection to the existing KYTC Estill
County Maintenance garage and Animal Shelter, set three (3) new 4’ diameter
manholes, a new 750 gallon per day waste water treatment plant with 3/4“water
service and power service, along with other appurtenances as indicated on the
drawings.
ReBid Purchase and Installation of Modular Office Buildings at the SWMS Recycling Center locations #3061
ReBid Purchase and Installation of Modular Office Buildings at the SWMS Recycling Center locations #3061
To furnish all labor, material and necessary equipment for the ReBid Purchase and Installation of Modular Office Buildings at the SWMS Recycling Center locations.
This project will include replacement of doors and door hardware, access control at entrances, accessible ramp from sidewalk to front entrance, wheelchair lift at entry vestibule, and radius entry canopies.
Replacement of the Electrical Gear in A030 of the UKGS Hospital
Lexington, KY
Click Here to View
West Carter High School Gymnasium Renovation
West Carter High School Gymnasium Renovation
The project consists of replacement of existing athletic wood flooring (gymnasium) system with a new athletic wood flooring system, including court markings/graphics and accessories, replacement of existing bleacher system with new telescoping bleacher system, volleyball equipment, and other misc renovations to the Gymnasium of the existing West Carter High School.
The project consists of replacement of existing athletic wood flooring (gymnasium) system with a new athletic wood flooring system, including court markings/graphics and accessories, replacement of existing bleacher system with new telescoping bleacher system, volleyball equipment, and other misc renovations to the Gymnasium of the existing East Carter HS.
Exterior concrete coating of the Anaerobic Selector Basins, Oxidation Ditches, Final Clarifiers and Splitter Box at the Stordes Creek Wastewater Treatment Plant
The buildings to be demolished are located at 123 *& 125 Warren Court, Lexington, Kentucky and consists of removing all structures, foundation walls, footings, landscaping, sidewalks, utilities, etc. as indicated and specified herein.
Lexington, KY
Click Here to View
Nancy Elementary Partial Roof Replacement
Nancy Elementary Partial Roof Replacement
This project includes a partial roof replacement at Nancy Elementary School.
The project scope includes construction of two classrooms, office and breakroom on the existing unfinished second floor of the Bell County Area Technology Center
RFB-211-13
Kentucky State University
The project consists of roof replacement on one (1) building; Roof Sections A, B, & C. Remove existing roof membrane system down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over base layer insulation, and cover board insulation. Provide crickets and tapered edge where indicated. Provide new metal components; e.g. metal counter flashings, scuppers, conductor heads, downspouts, plumbing vent flashings, metal expansion joint, etc.