Woodford County Public Schools BOE Emergency Generator
Woodford County Public Schools BOE Emergency Generator
Emergency Generator
Versailles, KY
Woodford County Public Schools BOE Emergency Generator
Emergency Generator
Versailles, KY
Woodford County Public Schools Asphalt Pavement Repairs
Asphalt Pavement Repairs
Woodford Co, KY
13-90 / Lime Kiln Water Main Replacement
Louisville Water Company is requesting Bids for the installation of +/-2,450 linear feet of 8-inch DPW water main along Lime Kiln Lane between River Knolls Road and Stoll Hill Road. Also included with the project are the installation of five fire hydrants, the relocation/renewal/transfer of eight customer services, and the installation of four residential customer service pressure-reducing valves. Mill and pave restoration of +/-21,120 square feet is required.
Louisville, KY
Idle Hour North Stormwater Improvements
Stormwater Improvements
Lexington, KY
Anchorage Public Schools 2013 Security Improvements
Anchorage, KY
Housing Authority of Winchester Modernization Project KY36P018-501(12)
Sight/Hearing Conversions, Gas Meter/Valve Replacement, Accessible (Full 504) Unit Conversion, Repaving, Flooring Replacement & Concrete Walks
Winchester, KY
Gateway Park Concessions Building REBID
Construction of a one-story 1,515 square foot wood framed building with wood roof trusses and concrete block foundation with future public restrooms and includes associated site work, general construction, plumbing, sanitary sewer, ventilation, and electrical.
Liberty, KY
Barbourville Business Park Contract 2: Access Road and Turn Lanes
The contract consists of grading, drainage and paving for turn lanes on KY Route 225 and approximately 500 feet of industrial park access road.
Barbourville, KY
Water Facilities Relocation KY 52-3 Garrard County KY
Contract GCWA-KY52-3 – This contract consists of the relocation of existing water distribution facilities along the new alignment of KY 52 from KY 954 in Garrard County to neat KY 595 in Madison County, KY. The work includes relocation of approximately 20,000 LF of lines ranging from 2” to 8” and the associated appurtenances such as meters, fittings, valves, etc.
Garrard Co, KY
US 60 Sidewalk Construction Project
The work to be bid upon is described as follows:
Concrete Sidewalk
Brick Paving
Various Storm Pipe and Structure Improvements
Concrete Curb and Gutter
Pavement Milling and Asphalt Surface
Landscaping, Streetlights & Street Furniture
Simpsonville, KY
Martin County Goverment Center Demolition Package
Demolition Package
Inez, KY
Springfield – Washington Commerce Complex Building Site Preparation
The work consists of earthwork to create a compacted, earthen pad approximately 101,250 square feet in size in the Springfield-Washington County Industrial Park located on Highway 555, at the north Springfield city limits.
Springfield, KY
Click Here to View
City of Frankfort IT Building and Finance Department Roof Repairs and Misc Improvements
Roof Repairs and Misc Improvements
Frankfort, KY
Verity Middle School Chiller Relocation
Verity Middle School Addition/Renovation
Bid Package #1 – Chiller Relocation
2800 Kansas Street
Ashland, KY 41102
Project MC6336 UK Hospital HD307 Angio UPS
Renovation of the UK Hospital HD307 Angio UPS
Lexington, KY
East Jessamine High School Culinary Arts Room
Nicholasville, KY
HA Hodgenville Waste-Line Replacements
Hodgenville, KY
RFB-221-13
Estimate:
$298,080.00
This project renovates 3,800 square feet of existing space on the Second Floor of the North End of the Gray Building to create a Business Synergy Center. The Center will provide a series of interrelated spaces where participants learn business and collaboration skills that are known to be essential to successful business ventures.
This setting will project a professional business atmosphere that is key in this training experience. Interior finishes will reflect this approach.
The Center will be visible from the corridor through a glass curtainwall system. The central reception area will be open with glass partitions that offer visibility into all other areas and convenient access. The Center will consist of a tiered classroom for 24 students. This room will have fixed tiered seating with electrified tables for laptop computers, WiFi, and projection capabilities. An Ideation Room has a capacity 12 individuals with 3 walls covered with “white board” for discovery of ideas, outlining strategies, and organizational problem solving. A third space will be “the Board Room” which will provide professional setting for board room presentations and corporate role-playing.
Finishes will include mahogany panelling, glass partition, granite countertops. Floors will be carpet tiles. Ceiling will be 2×2 lay-in acoustical panels. Lighting will include a variety stage sets for the activities described above. HVAC will utilize new units to conform to the new layout.
Madisonville, Kentucky
RFB-2-14
Estimate:
$7,346,159.00
This project, Renovate Mignon Residence Hall, will include a general renovation and upgrades to the facility. The upgrades will include the following: replacement of floor coverings, renovations of all bathrooms, kitchen, and lobby areas, elevator upgrades, masonry repairs, I.T. upgrades, window replacement, ADA accessibility, mechanical upgrades, and exterior drainage improvements.
The scope of work will include the redevelopment of a new entry focus and associated site work. Site work design is structured to create an enhanced approach and entry to the facility from the west façade of the building. The site work creates an outdoor patio area with new entry stairs leading to the building. A new ADA ramp is provided to allow for the facility to better serve the occupants that have mobility disabilities.
Also as part of the project, the overall exterior appearance of the building will be updated to match the other adjacent building in the complex with a new brick façade. The existing precast panels will be removed and replaced with a brick façade.
The renovation consists of replacing the plumbing fixtures in the residence rooms and installing new water heaters. New maintenance and drain valves are also to be installed. The steam-to-hot water heat exchanger will be replaced along with adding new HVAC units for the main lobby level and heat in the corridors. Rooftop units will provide exhaust and outside air for the facility. An alternate will replace the cooling tower.
Morehead, Kentucky
RFB-5-14
Estimate: $1,504,256.59
The project consists of new construction and renovation; the new construction
including general construction, mechanical, plumbing and electrical work. The work
entails and addition of approximately 7,500 square feet and renovation of
approximately 960 square feet of the existing building. The addition is a single story,
steel frame with metal stud walls and brick veneer, a shingle roof over nailboard
composite insulation and metal roof deck .
Somerset, Kentucky
Vine Grove Elementary Site Improvements
Vine Grove, Kentucky
13-86 / Adams Hill Townhomes Water Main Replacement
Louisville Water Company is requesting Bids for the installation of 65 +/- linear feet of 6-inch Pressure Class 350 ductile iron water main (using traditional trench installation and lay-in-place techniques), Supply and Installation of 990 +/- linear feet of 6-inch HDPE DIPS DR-11 (using traditional trench installation or directional drill techniques) and Supply and Installation of 195 +/- linear feet of 4-inch HDPE DIPS DR-11 (using traditional trench installation or directional drill techniques) and appurtenances and to restore the site. Also included with the project is the installation of 2 fire hydrants, the relocation/renewal/transfer of 28 customer services and 7 meter exchanges. All ductile iron pipe and pipe appurtenances will be supplied by Louisville Water Company. All HDPE material shall be supplied by the contractor..
Louisville, KY
13-88 / Lexington Road Area Lead Services Renewals
Louisville Water Company is requesting Bids for the renewal of lead services in the Lexington Road Area. Design information indicates a total of 104 customer service renewals, seven (7) customer service discontinues and 42 meter exchanges.
Louisville, KY
13-81 / 2013 Cathodic Protection Installation Project
Louisville Water Company is requesting Bids for the supply and installation of +/- 1,364 sacrificial 32-lb. magnesium anodes and 25 test stations on existing water main.
Louisville, KY
13-87 / I-65 Area Water Main Replacement Project
Louisville Water Company is requesting Bids for the installation of +/- 1,970 linear feet of 12-inch DPW water main, +/-3,270 linear feet of 8-inch DPW water main, +/- 857 linear feet of 6-inch DPW water main, and 140 linear feet of 4-inch DPW water main along Preston Highway between E. Indian Trail and 5902 Preston Highway, along Clarks Lane between Pendell Ave. and 1004 Clarks Lane, along Shelby Street between Brandeis Ave. and Burnett Ave, and along Arthur Street between Eastern Parkway and 2008 Arthur St. Also included with the project is the installation of 11 fire hydrants, the relocation/renewal/transfer of 102 customer services, 12 service discontinues, and 5 meter exchanges.
Louisville, KY