Coldstream Research Campus Bio-Infiltration Swale and Trail Project
Coldstream Research Campus Bio-Infiltration Swale and Trail Project
This project includes the construction of a bio-infiltration swale and approximately 900 linear feet of trail within the Coldstream Research Campus. The work includes General Requirements, selective demolition of existing concrete and asphalt pavement, installation of a shared-used trail constructed of porous concrete and bituminous asphalt pavement, installation of a precast concrete wall, earthwork, drainage swale armoring, temporary and permanent erosion control blankets, planting installation, planting maintenance and other related site improvements.
Lexington, KY Click Here for More Details
Frakes Elementary School Parking Repair
Frakes Elementary School Parking Repair
The project scope includes repair of a parking area adjacent to the retaining wall.
Pineville, Ky Click Here for More Details
Estill Co Water District No.1 Phase 10 Water Line Extensions
Estill Co Water District No.1 Phase 10 Water Line Extensions
The installation of approximately 36,500 L.F. of 8-inch and 6-inch PVC pipe, approximately 12,840 L.F. of 4-inch PVC pipe and 3-inch PVC pipe, water meters, hydrants, water booster stations, chlorine booster stations, and accessories.
Estill County, Ky Click Here for More Details
Runway Rehabilitation and Lighting Project at Sturgis Municipal Airport
Runway Rehabilitation and Lighting Project at Sturgis Municipal Airport
Project Description: This project consists of removal of the existing asphalt overlay, rubblization of the underlyning concrete base bituminous asphalt overlay. In addition, the project also consists of new runway lighting and NAVAIDs as well as pavement markings.
The project is the partial renovation of the 8,573 square foot, fifth-floor of the Robotics Building on the University of Kentucky’s main campus. The work generally consists of the following:
Selective demolition of CMU and gypsum board systems walls, lay-in ceilings and associated suspension systems, HM frames and wood doors, resilient flooring and base, electrical devices and wiring, and plumbing fixtures with associated piping.
New gypsum board system walls and selected ceilings and soffits
Lay-in acoustic ceilings
Hollow metal door frames
Solid wood doors
Aluminum storefront systems
Resilient floor tile
Carpet tiles
Architectural woodwork counters
Laboratory casework
Selective new Mechanical work
Selective new Plumbing and Fire Protection work
Selective new Electrical work
Lexington, KY
Click Here to View
13-99 / Tank Coating Program 2013 – Blankenbaker Crossings and Jefferson Memorial Tanks
13-99 / Tank Coating Program 2013 – Blankenbaker Crossings and Jefferson Memorial Tanks
Louisville Water Company is requesting bids for recoating exteriors and limited interiors of two (2) existing elevated water storage tanks, including surface preparation, coating application, new cathodic protection system, electrical work and miscellaneous tank accessories and site work as noted on contract documents.
RFB-28-14 Education Building Renovation Newtown Campus
RFB-28-14
Estimate:
$1,577,678.00
The project is the interior renovation of a one-story building and the construction of a small addition to that building. Contractor should review the Construction Documents for specific information.
Interior Renovation: Substantial interior demolition and removal of materials off-site. Installation of new metal stud/gypboard systems in a large portion of the building. Installation of new hollow metal frames and solid wood doors in a large portion of the building. Installation of new lay-in ceiling. Patching of existing gypboard walls. Painting of entire interior, including walls and door frames. Floor preparation and installation of VCT and carpet finishes. Toilet partitions and accessories. Replacement glazing in a few selected aluminum windows. Installation of a new fire protection system, both in interior and attic truss spaces. Complete new mechanical, electrical, data, and alarm systems. Building Addition:Sitework consisting of a built-up engineered fill pad. Minor concrete paving. Minor sodding and seeding. Cast-in-place concrete slab with perimeter rigid insulation. Steel frame with bar-joist structural system. Metal stud and brick masonry veneer. Aluminum windows and storefront systems. Building insulation. 2-ply SBS-Modified Bitumen roof. Installation of new metal stud/gypboard systems. Installation of new hollow metal frames and solid wood doors. Installation of new lay-in ceiling. Painting of entire interior, including walls and door frames. Floor preparation and installation of VCT and carpet finishes. Toilet partitions and accessories. Installation of a new fire protection system. Complete mechanical, electrical, data, and alarm systems.
City of Jeffersontown Taylorsville Road Streetscape
City of Jeffersontown Taylorsville Road Streetscape
The project consists but not limited to the reconstruction of concrete sidewalk along each side of Taylorsville Road between College Drive and Ruckreigle Parkway; and reconstruction of the Taylorsville Road/Watterson Trail town square area to include the installation of areas of brick paving and constructed architectural features. The project also includes the construction and installation of supporting improvements along the Taylorsville Road right-of-way consisting of low brick walls, brick paver verge, landscaping, and lighting; and the fabrication and installation of two gateway arch structures located at each end of the corridor.
New Wind Cone & Segmented Circle at McCreary County Airport
New Wind Cone & Segmented Circle at McCreary County Airport
To Furnish all labor, materials, equipment and perfoming all work necessary to Install a New Wind Cone and Segmented Circle at the McCreary County Airport.
13-100 / Bullitt County Water Improvement Program Horse Run Court and Hill Creek Road Grid-Tie
13-100 / Bullitt County Water Improvement Program Horse Run Court and Hill Creek Road Grid-Tie
Louisville Water Company is requesting Bids for the furnish and installation of 765 +/- lineal feet of eight (8)-inch PVC DR 18 water main and appurtenances. Restoration of the site, and all of the above made ready for use in accordance and compliance with the Contract Documents.
13-104 / Crescent Hill Gate House and Gatekeepers House Improvements
13-104 / Crescent Hill Gate House and Gatekeepers House Improvements
Louisville Water Company is requesting Bids for providing all labor, rigging, tools, equipment, and materials for the roof replacement and masonry restoration at the Crescent Hill Gate House. See contract documents for additional details.
Drug Store LS Elimination and Woodcreek LS Replacement Project
Drug Store LS Elimination and Woodcreek LS Replacement Project
The work shall generally consist of: Installation of 1,450LF of 8 inch gravity sewer main, replacement of a 250 gpm lift station, and 350LF of 6 inch force main.
This project is to supply and install a new electronic ticker board to a curved wall in the College of Business. This will include all parts and labor needed to install the unit on our wall per the attached drawings. The wall, electric and electronic connections will be by others.
Convert part of existing greenhouse into research lab, new HVAC system, and creating lab space for researchers. Portion of space shall be certified by USDA for the proper containment of small animals. New skin, interior and ceiling system are included.