Runway 4-22 Crack Repair, Seal Coat, and Pavement Marketing at Tompkinsville – Monroe County Airport
Runway 4-22 Crack Repair, Seal Coat, and Pavement Marketing at Tompkinsville – Monroe County Airport
Tompkinsville, KY
Runway 4-22 Crack Repair, Seal Coat, and Pavement Marketing at Tompkinsville – Monroe County Airport
Tompkinsville, KY
Tug Valley Wastewater Treatment Plant Contract 1
The program of work for which bids are to be submitted consists of the construction of phase 1 of a 200,000 gallon per day (GPD) wastewater treatment plant using the process called “Sequencing Batch Reactor”. The proposed treatment process will include a process train that includes a Fine Screening/Solids Removal facility, Influent Pump Station, Two SBRs Basins, Post Flow Equalization basin, Chlorine Contact Basin, Aerobic Digestion basin, Sludge Dewatering drying beds, Chemical Feed System, Control/Laboratory Building, maintenance building, and a Back-up Power emergency generator including all related appurtenances.
Martin, KY
Tug Valley Wastewater Collection System Contract 2
Contract No 2 consists of the construction of approximately 40,200 LF of 6-inch, 4-inch, 3-inch, 2-inch and 1 ¼-inch HDPE force mains, four (4) sewage pumping stations and 252 residential grinder pump stations including all related appurtenances.
Martin Co, KY
Deane 150,000 Gallon Water Storage Tank
Construct a new standpipe water storage tank with a capacity of 150,000 gallons.
Letcher Co, KY
Water System Improvements Deane Area Phase 3
Construct approximately 23,238 feet of 3-inch through 8-inch water main, one 200 gpm water booster pumping station and related appurtenances.
Letcher Co, KY
Boone National Guard Armory
Estimate:
$350,000.00
This Work consists of constructing a Motor Pool parking facility for military vehicles; including earth work, gravel parking, concrete turning pads, fencing with swing gates, storm drain structures and erosion protection.
Frankfort, Kentucky
Buechel National Guard Armory
Estimate:
$ 96,000.00
This project includes: 1) Preparation of alligator cracks and joints and subsurface soft spots as detailed ; 2) Install asphalt surface repaving; 3) Remove and reinstall concrete wheel stops w/dowels at completion of resurfacing; 4) Install subsurface 4″ diameter drainage tubing, as necessary to remove water; 5) Install 4″ wide permanent striping and handicap surface signage
Louisville, Kentucky
Richmond National Guard Armory
Estimate:
$ 96,000.00
This project includes: 1) preparation of alligator cracks and joints and subsurface soft spots as detailed; 2) Install asphalt surface repaving; 3) Remove and reinstall concrete wheel stops w/ dowels at completion of resurfacing; 4) Remove and dispose of existing fence; 5) Install new fence; 6) Re-grade existing MVSA parking surface, install additional DGA; 7) Install french drain with piping; 8) Install subsurface 4″ diameter drainage tubing; 9) Install 4″ wide permanent parking strips, yellow main road centerline and blue handicap surface signage
Richmond, Kentucky
Westside Park Pedestrian Bridge & Improvements and Little River Walking Trail
The project will consist of a variety of elements to include the installation of abutments, the installation of the bridge, erosion control, earthwork, as well as the installation, repair, or replacement of sidewalks where necessary. This project is being bid with unit pricing.
Hopkinsville, KY
KY 1848 Widening & Interchange Relocation Phase 1
Contract consists of relocating 1,267 LF of 20″ ductile iron and 1,275 LF of 16″ ductile iron waterline and appurtenances.
West Shelby Water District, KY
US WorldMeds Headquarters Office Building
The US WorldMeds Office Building project consists of approximately 30,000 SQ FT of concrete, basement walls, structural steel, natural stone panels, floor finishes, drywall, mechanical, electrical, plumbing and sprinkler.
The site location is:
US WorldMeds Office Building
4441 Springdale Road
Louisville, KY 40241
Equestrian View Street Trees
Landscaping
Lexington, KY
The Piarist School New Building
New Building
Subcontractors and Vendors Only
West Prestonsburg, KY
Contract 74: Kentucky River Raw Water Intake Pump Replacement Project
Pump Replacement
Winchester, KY
13-142 / Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 2
Louisville Water Company is requesting Bids for the replacement of four (4) filter drain valves and actuators at the B.E. Payne Water Treatment Plant.
Louisville, KY
Berea City Hall County Clerk’s Office Renovation
City Clerks Office Renovation
Berea, KY
RFB-80-14
Boone National Guard Center
Estimate: $386,595.00
Work includes providing all required material, labor and equipment to perform selective demolition and associated reconstruction of project improvements at the Field Maintenance Shop (FMS #5), Boone National Guard Center in Frankfort, Kentucky.
The scope of work includes the complete renovation of two offices, conversion of the existing latrine to a washroom, renovation of the existing break room and upgrades to the mechanical and electrical systems serving those spaces. Specific work items include cutting and removing exterior wall areas to allow installation of new blast resistant aluminum windows and vents; cutting and removal of existing bar joist, metal decking and concrete fill to install new stair tower; and removal of existing upper interior partition walls to allow installation of new metal stud and gypsum wall assemblies with metal cladding. Finishes will include new gypsum panels, painted concrete masonry units, sealed and polished concrete floors and pre-formed metal wall panels.
Mechanical and electrical improvements include removal of existing plumbing and installation of new plumbing supply, waste and vent systems, relocation of existing RPV assembly and installation of new plumbing fixtures. Mechanical improvements include the complete removal of the existing gas fired split system and installation of a new ductless HVAC system, installation of a new heat recovery makeup air system and associated ducting and condensation piping. Electrical improvements include installation of new service bay lighting; light sensors, light fixtures and receptacles in the upgraded areas, and installation of emergency generator transfer switch.
Frankfort, Kentucky
RFB-79-14
Southeast KY Community & Tech College
Estimate: $276,642.00
The project is a conversion of an existing space into a Mortuary Science Laboratory. The existing space is approximately 650 square feet located in the lowest level of Falkenstein Hall on the Cumberland, Kentucky campus of the Southeast Kentucky community and Technical College. The demolition required for the project includes but is not limited to, the removal of existing fixtures and equipment and a portion of the floor slab.
Cumberland, Kentucky
RFB-71-14
Ashland Community & Technical College
Estimate: $260,000.00
This project will consist of performing a 1.5” asphalt overlay on the existing upper parking lot located at The Ashland Community & Technical College campus in Ashland, Kentucky. New concrete curb and gutter islands will be constructed as well as a new asphalt section of parking connecting to the existing lot. The project will include storm sewer, asphalt, concrete curb and gutter, grading and earthwork. The entire project area is less than 2 acres.
Ashland, Kentucky
Sandy Hook Contract 10 Water System Imp
The program of work for which bids are to be submitted consists of approximately 16,000 LF of water main extensions and replacements, upgrading existing telemetry, and all related appurtenances as described in the specifications and plans.
Elliott Co, KY
Sandy Hook Contract 11 New Groundwater Well and Appurtenances
The program of work for which bids are to be submitted consists of one new groundwater well and all related appurtenances as described in the specifications and plans.
Elliott Co, KY
Hopewell Spring Park Retaining Wall
The scope of work consists of construction of approximately 210 linear feet of precast concrete modular block retaining wall and related work. The wall height ranges from 2 feet to 16 feet high. Related work includes handrail, cast-in-place concrete steps and drainage improvements.
Paris, KY
Harlan Housing Authority Waste-Line Replacement
Waste-Line Replacement (six-story apartment building)
Harlan, KY
Harrods Creek Force Main Phase 3B
This Contract provides for the installation of approximately 15,685 linear feet of 30-inch force main sewer pipe, erosion control, and appurtenant work. The Project is generally located in Prospect along Chamberlain Lane, Norton Commons development, and Glen Oaks golf course within Jefferson and Oldham Counties.
Louisville, KY
13-141 / Crescent Hill Water Treatment Plant Frankfort Ave. Wall Restoration
This project consists of the furnishing and installing of two (2) complete odor control systems and all related appurtenances. One (1) system shall be installed at the 10th Street Pump Station and one (1) system shall be installed at the Downtown Wastewater Treatment Plant Headworks.
Louisville, KY