Housing Authority of Floyd County
Housing Authority of Floyd County
Authority of Floyd County (Handrail and Guardrail Replacement at Exterior Steel Stairs at KY157-08 Warco)
Floyd Co, KY
Housing Authority of Floyd County
Authority of Floyd County (Handrail and Guardrail Replacement at Exterior Steel Stairs at KY157-08 Warco)
Floyd Co, KY
NKCC-29-14 New Gateway Sign
New Gateway Sign at University Drive and Johns Hill Road.
Highland Heights, KY
CCK-1961-14 Little Library Rooms 301 & 302 Renovation
Contractor to furnish labor and materials to renovate rooms 301 and 302 of the Little Library
Lexington, KY
Roadway Rehabilitation Man O War at Harrodsburg Road
The work entails rehabilitation of four (4) lanes of southbound Man O’ War Boulevard at the intersection of Harrodsburg Road. Work shall consist of excavating approximately 1300 square yards of existing pavement and dense graded aggregate (DGA) base, and then rebuilding with 6” of DGA base and 10” of Portland cement concrete pavement. Work shall also include installation of pre-formed traffic control loops and reestablishment of signal control via the new loops. Additional tasks shall include joint sealing, traffic markings, bituminous transition zones and related work.
Lexington, KY
North Nelson Water District US 31E Waterline Relocation Phase 2
This contract consists of approximately 3,960 LF of 8″ waterline, 1,400 LF of 6″ waterline, 3,065 LF of 4″ waterline and 890 LF of 3″ waterline, 28 tie-in connections and all necessary appurtenances. This is a relocation of existing facilities. No rock trenching will be allowed on this project.
North Nelson Water Dist, KY
Garrard County Emergency Operations Center
The Following Bids are Requested:
1 PAVING
2 GENERAL TRADES
3 MASONRY
4 ROOFING
5 ALUMINUM WINDOWS AND STOREFRONTS
6 DRYWALL AND FRAMING, ACOUSTICAL CEILINGS
7 PAINTING / COATINGS
8 FLOORING
9 MECHANICAL
10 ELECTRICAL
11 COMBINATION
Lancaster, KY
Pine Creek, Cram Creek and Pert Creek Phase 2 Water System Improvements
Construct approximately 38,120 feet of 3-inch through 8-inch water main, prefabricated booster pump station, master meter vault, pressure reducing vaults, and related appurtenances.
Letcher Co, KY
Idle Hour Trunk Sewer Replacement
The Project Includes providing all construction, labor, material, tools and test equipment necessary for the construction of 2,287 ft or 21 inch sanitary sewer, 195 ft of 10 inch sanitary sewer, 710 ft of 8 inch sanitary sewer, 34 manholes, and all other necessary appurtenances
Lexington, KY
The Sampson Branch Watershed Project
This project consists of the providing of all materials labor and equipment for the construction of: Furnish and install, complete and ready for service, 505 L.F. of 60″ diameter storm drain under +/- 30 feet of cover. Remove and/or grout approximately 480 L.F. failed 48″ storm drain. Relocate utilities and restore surfaces as necessary. Maintain existing storm drainage throughout construction.
London, KY
Click Here to View
Eagles Nest Pump Station
Contract 12 consists of one (1) above ground water pump station.
Pulaski Co, KY
Fleming 2012 Water Project
Approximately 46,000 LF of 3-inch to 8-inch water line replacement and upgrade, including appurtenances.
Engineer’s Estimate is $900,000
Fleming Co, KY
Harlan Housing Authority Waste Line Replacement
Waste Line Replacement (six-story Apartment Building)
Harlan, KY
Putnam Stadium Locker Rooms
The project scope is to install aluminum grandstand bleachers and press box along with the demolition of the existing stadium structure. The project scope will include electrical and plumbing work, along with concrete foundations for masonry, roofing and railings.
Ashland, KY
Runway 6-24 Crack Repairs and Overlay Project Wendell H Ford Airport
Runway 6-24 Crack Repairs and Overlay Project
Chavies, KY
City of Frankfort Forest Villa Manhole Rehabilitation
The project scope includes the rehabilitation of a manhole and an open cut repair of one of its pipe penetrations along with replacement of the cover of a second manhole with a hatched lid.
Frankfort, KY
City of Frankfort Crestwood I&I Rehabilitation Project
Frankfort, KY
Meadows Northland Arlington Neighborhood Improvement Project Phase 5C
Construct all associated sanitary and storm sewer piping and structures as shown. Provide all erosion control measures, concrete sidewalk, curb and gutter, and asphalt paving as required.
Lexington, KY
Mckee Housing Authority Sidewalks and Porch Pads
The replacement of sidewalks and installation of additional porch pads.
McKee, KY
TARC Customer Service Kiosk Replacement
The Transit Authority of River City will receive sealed bids for the furnishing of all labor, materials and the performance of all work required for the Union Station TARC Customer Service Kiosk Replacement Project.
Louisville, KY
Lexington-Fayette Urban County Housing Authority Central Office Exterior Improvements
Central Office Exterior Improvements
Lexington, KY
Stratton Branch AML Water Supply Project
This project consists of providing all materials, labor, and equipment for the construction of a water distribution system including 4,230 of PVC water line, 1,880 LF of ductile iron water line, 1,150 LF of HDPE service line, and 27 residential meters.
Prestonsburg, KY
Cerulean 300,000 Gallon Water Storage Tank Barkley Lake Water District
The construction of a 300,000 gallon water storage tank, site work, yard piping, access road, and fencing.
Cerulean, KY
Water System Improvements Barkley Lake Water District
The installation of approximately 6,795 LF of 6-inch PVC pipe, 305 LF of ductile iron pipe, hydrants, water booster pumping station, telemetry and accessories.
Trigg Co, KY
Kentucky Division of Water
Estimate:
$140,400.00
The project consists of the following main activities:
Remove accumulated sediment from the existing Beech Creek Dam spillway stilling basin and downstream channel; Remove rock in the channel bottom to lower the water level in the stilling basin; and Locate, install additional piping, clean, and videotape the existing foundation drains.
Manchester, Kentucky
Butler Reserve Center Renovation Military Affairs
Estimate: $3,332,943.00
The Work consists of selective demolition and renovation to an existing military administrative/training building located next to Bowman Field, in Louisville, Kentucky, that consists of a 52,000 S. F., 2-story administration wing and a 12,000 S. F., one-story Assembly wing. Interior renovation work will entail: replacement of existing floor finishes throughout most of the facility, replacement of limited ceiling tiles, construction of limited interior walls with doors and frames, new HVAC, electrical upgrades, limited plumbing, painting; while exterior work will primarily consist of tuck pointing and sealing existing masonry as well as constructing a new “Rain Screen” wall system that will be comprised of brick,
aluminum and glass. Site work will include asphalt paving, limited grading and landscaping.
Louisville, Kentucky