Please note: Addendum 03 has changed the Bid Date!
Description and location of Project: Construction of a 48 MGD pump station with 10 submersible sanitary pumps and 2 submersible grit pumps; installation of 124 linear feet of 12-inch pipe, 48 linear feet of 18-inch pipe, 10 linear feet of 24-inch pipe, 440 linear feet of 30-inch pipe, 41 linear feet of 36-inch pipe, 11 linear feet of 42-inch pipe, 232 linear feet of 48-inch pipe, and 445 linear feet of 60-inch pipe; six (6) diversion structures; two (2) control structures; erosion prevention and sediment control; pavement restoration; and associated electrical, mechanical, instrumentation and control systems. The generally located along or adjacent to Main Street between 4th Street and 13th Street.
Bluegrass-Oakwood is an Intermediate Care Facility supporting individuals with intellectual and developmental disabilities. Construction at this site must be performed in a manner that protects the existing staff and clients from risks that are inherent to construction operations.
Work of the Project includes:
1. Full tear off of existing low slope roof systems and replacement at Cottages 112, 116, 117 and 118.
2. Construction of a new insulated low wall in front of the existing clerestory finished with new aluminum wall panels.
3. The work also includes permanent removal of existing ornamental steel vent stacks, repair roof deck using .25″ steel plate, and protection of or reinstallation of existing PVC vent pipe that is still in use.
4. All other work shown on the Contract Drawings and/or included in the Project Manual.
PROJECT DESCRIPTION:
Bondurant Heights:
Installation of new concrete parking areas and drainage and grading modifications.
Work includes providing all items, articles, materials, operations or methods including all labor, materials, equipment, services and incidentals as necessary for their completion.
Housing Authority of Shelbyville – HVAC Replacement
Housing Authority of Shelbyville – HVAC Replacement
PROJECT DESCRIPTION:
Bondurant Heights:
Replacement of existing gas furnaces & condensing units. Work consists of, installing furnaces, flushing
existing line sets, new concrete pads, new flooring & paint in mechanical closet.
Work includes providing all items, articles, materials, operations or methods including all labor, materials, equipment, services and incidentals as necessary for their completion.
CCK-2283-18 Construct Spline Utilities: Chiller 6 & CUP Building Revisions BP8 – 2425.0
CCK-2283-18 Construct Spline Utilities: Chiller 6 & CUP Building Revisions BP8 – 2425.0
Please Note: Addendum 04 has changed the Bid Date
PROJECT DESCRIPTION:
The Chiller 6 and CUP Revisions (Bid Package #8) consists of an installation of a 2500 ton chiller and associated pumps/valves, sewage ejector pump, revisions to blowdown piping etc. A list of trade contracts for this work is listed below.
Connector from Fishtrap Road to Upper Pompey Road – Phase 2
Connector from Fishtrap Road to Upper Pompey Road – Phase 2
Please Note: Addendum 2 has changed the Bid Date
PROJECT DESCRIPTION:
The work includes: Grade, Drain, and Surfacing for approximately 8,825 LF of new roadway with approximately
21,000CY of unclassified excavation.
City of Russell – 2018 Water System Improvements: Contract 2 – Booster Pumping Station & Transmission Mains
City of Russell – 2018 Water System Improvements: Contract 2 – Booster Pumping Station & Transmission Mains
PROJECT DESCRIPTION:
The program of work for Contract 2 which bids are to be submitted consists of the construction of a booster
pumping station, 7800 linear feet of 12-inch DIP transmission main, 400 linear feet of 8-inch water mains,
various utility and highway crossings with bore and jack casing pipe, re-connection of existing water mains and
customer services. Included are the following: site clearing & grading, excavation, concrete foundation, site
work, piping& gate valves, telemetry, electrical, and painting for the City of Russell, Contract 2 – Booster Pumping Station and Transmission Mains.
City of Russell – 2017 Water System Improvements: Contract 1 – 1 MG Ground Storage Tank
City of Russell – 2017 Water System Improvements: Contract 1 – 1 MG Ground Storage Tank
PROJECT DESCRIPTION:
The program of work for Contract 1 which bids are to be submitted consists of the construction of a One (1)
Million Gallon Welded Steel Ground Storage Tank for potable water. Included are the following: site clearing &
grading, excavation, concrete foundation, site work, access road & entrance road improvements, piping &
valve vault, fencing, telemetry, electrical, painting, and mixing system for the City of Russell, Contract 1 – 1 MG Ground Storage Tank.
CCK-2302-18 Agricultural Science Building North – Exterior Concrete Repair Project
CCK-2302-18 Agricultural Science Building North – Exterior Concrete Repair Project
Please Note: Addendum 1 has canceled the Pre Bid Meeting and postponed the Bid Date
PROJECT DESCRIPTION:
Repair damaged concrete facade at the 4 story portion of the building – all 4 sides – recoat 100% and add metal
flashing. Work includes updating the surface under the existing lightning
arrestor system on the parapet to be reinstalled under another contract. The
Contractor is responsible for noise control. The Contractor is responsible for relating
instructions to all employees, Sub-Contractors and suppliers on site and, if needed,
providing a language translation employee as required. No tobacco products, alcohol, drugs, firearms or fraternizing with students are allowed on site. If any the above is conducted, immediate dismissal from the Project will be enforced.
West Hickman Wastewater Treatment Plant – Scum Removal Addition & Aerated Sludge Holding Tank No 3 Cover Project
West Hickman Wastewater Treatment Plant – Scum Removal Addition & Aerated Sludge Holding Tank No 3 Cover Project
PROJECT DESCRIPTION:
This project includes the following:
a. Construct scum concentrator
b. Install scum pipes in existing biological phosphorus removal tanks
c. Install cover on existing aerated sludge holding tank
d. Construct enclosure for existing odor control facilities
e. Structural improvements
f. HVAC and plumbing improvements
g. Electrical and SCADA improvements
h. Install water line for fire protection
CCK-2301-18 Agricultural Science Building North – Replacement of AHU AS-9
CCK-2301-18 Agricultural Science Building North – Replacement of AHU AS-9
PROJECT DESCRIPTION:
This project replaces the supply fan, return fan, chilled water coils, steam
coil, drain pans, dampers and upgrades controls for the AS-9 air handling unit.
City of Stanford Water Works- KY 1247 Somerset Bridge Replacement Utility Relocation
City of Stanford Water Works- KY 1247 Somerset Bridge Replacement Utility Relocation
PROJECT DESCRIPTION:
The Project consists of constructing approximately 780 linear feet of 12 and 8
inch PVC Water Line and 320 linear feet of 12 and 8 inch PVC Gravity Sewer Line for the KY 1247 (Somerset
St.) Bridge Replacement – Utility Relocation.
City of Booneville – Booneville Water Storage Tank Replacement Project
City of Booneville – Booneville Water Storage Tank Replacement Project
PROJECT DESCRIPTION:
Work is generally to include installation of two 100,000 gallon water storage tanks and demolition of two existing 100,000 gallon welded steel tanks and foundations. Telemetry will be a part of this project.
Pat Frary of CSI has visited both tank sites, and therefore you may want to contact him to complete the required geotechnical work. 859-227-5686 or pfrary@csikentucky.com
The Engineer’s Estimated Opinion of Probable Construction Cost ranges from $560,000 –
$590,000.
PROJECT DESCRIPTION:
Furnishing all labor, materials and equipment and performing all work necessary for Apron Rehabilitation at the Stuart Powell Field
The Work of Project is defined by the Contract Documents and consists of the following:
1. The Work includes the construction of new parking lots with lighting, and landscaping and other site improvements around the existing building.
2. The Work also includes minor interior improvements including:
a. Application of sun-screening film to curtainwall glazing.
b. Installation of door hardware.
c. Staining of concrete treads, landings, and adjacent flooring.
d. Repair of metal pan ceilings.
e. Installation of Visual display units and tackboards.
f. Repair of other finishes.
Project will be constructed under a single prime contract.
Louisville Water Company is requesting Bids for the renewal of lead services on Bardstown Road, Barret Avenue, Bates Court, Baxter Avenue, Bellwood Avenue, Beverly Road, Castlevale Drive, Castlewood Avenue, Cross Road, Eastern Parkway, Edenside Avenue, Hartman Avenue, Hawthorn Hill, Hill Road, Mossrose Avenue, Norris Place, Rosewood Avenue, Royal Avenue, Sherwood Avenue, Stevens Avenue, Summit Avenue, Tyler Park Drive, Tyler Parkway, Valley Road, and Windsor Place. Design information indicates a total of 223 customer service renewals/relocates, one (1) customer service discontinue and 164 meter exchanges.
Questions or inquiries relating to this project must be submitted in writing via email at least seven (7) calendar days prior to the bid opening date. All questions and inquiries must be sent to the Buyer, Robin Heitz, email at rheitz@lwcky.com.
The Company’s Project Manager’s estimate for the Contract plus Company supplied materials for this Project is $500,001 – $1,000,000. If the Company’s Project Manager’s estimate for the Contract plus Company supplied materials exceeds $250,000: a Bid Bond is required. For this Contract, a Bid Bond is required.
Bids will only be accepted from Bidders who have been prequalified by the Company in the prequalification category or categories that apply to this Bid. This Bid requires prequalification in the 1” & Smaller Water Services prequalification category. For information about prequalification, contact the Buyer listed above.
Bid Documents may be obtained from Lynn Imaging located at 11460 Bluegrass Pkwy, Louisville, KY 40299, (502) 499-8400 and www.lwckyplanroom.com. One copy of the Bid Documents (includes technical specifications and a full set of plans) will be available at no charge (not including shipping/delivery charges) to Contractors that are prequalified with Louisville Water Company in the category specified for this bid. For details regarding the charges that apply to non-prequalified contractors, go to www.lwckyplanroom.com.
City of Elizabethtown – Public Works Facility – Operations Building & Covered Shed
City of Elizabethtown – Public Works Facility – Operations Building & Covered Shed
PROJECT DESCRIPTION: The project consists of construction a new 19,325 SF
+/- Public Works Operations Building, a new 4,820 SF Covered Shed for Vehicle Storage and the associated site work for both structures
PROJECT DESCRIPTION:
Furnishing of all labor, materials and equipment and performing all work
necessary for Mill and Overlay Airfield Apron Project at the Lake Cumberland Regional Airport
CCK-2300-18 F. Paul Anderson Tower 263 & Seaton Center 212 Renovation
CCK-2300-18 F. Paul Anderson Tower 263 & Seaton Center 212 Renovation
PROJECT DESCRIPTION:
Renovation of classroom FPAT 263. Upgrade the existing classroom. Work includes a new
acoustical tile ceiling, new LED lighting, revised HVAC, new paint, and updated A/V
components.
The project consist of the renovation & upgrades for 4 bathing suites for Western State Hospital in Hopkinsville, KY.
The work includes but not limited to:
Selective demolition, wood door replacement, shelving, cabinets, resinous wall and floor coating system, toilet partitions, toilet accessories, acoustical ceiling replacement, painting plumbing fixtures and new lighting.
Northern Madison County Sanitation District – KY 627 Sanitary Sewer Collection System Expansion
Northern Madison County Sanitation District – KY 627 Sanitary Sewer Collection System Expansion
PROJECT DESCRIPTION:
Work is generally to include installation of approximately 4,000 linear feet of 3″ (or Alternatively
4″) PVC and Ductile Iron Sewer Force Main.
The Engineer’s Estimated Opinion of Probable Construction Cost ranges from $85,000 to
$110,000
PROJECT DESCRIPTION:
In classroom 106, existing chalkboards will be covered with a new full-height wall. New
chalkboards will be installed in this front wall. Electrical outlet locations in the existing wall will be
relocated. Projector mounts will be moved and re-centered. A new center teaching console also be installed.
Renovations to room 333 include new acoustical tile ceiling, new LED lighting, revised HVAC, new
paint, new window blinds, and updated A/V components.
Renovations to room 335 include new acoustical tile ceiling, new LED lighting, revised HVAC, new
paint, new window blinds, and updated A/V components.
Note that rooms 337 & 339 are included as Alternates under this project. Their scope is identical to
room 335.