Gamaliel City Hall – CDBG ADA Improvement Project

Gamaliel City Hall – CDBG ADA Improvement Project

PROJECT DESCRIPTION:
The Gamaliel City Hall CDBG ADA Project will consist of renovating the existing City
Hall building and parking lot in order to comply with the Kentucky Building Code adopted
ADA Standard.

The work to be bid consists of:
Interior building improvements of restroom facilities and exterior site improvements including, but not limited to, a new asphalt parking lot, a new ADA handicap access ramp, sidewalks, and minor demolition.

Project Location: Gamaliel, Kentucky

More Details

Pikeville Medical Center – Heart Institute Addition & Renovation

Pikeville Medical Center – Heart Institute Addition & Renovation


Please note: Addendum 1 has changed the Bid Date!

PROJECT DESCRIPTION:
Renovation of 26,000 square feet for the Heart Institute
and 27,000 square feet for support services located on the first and second
floors of PMC’s Miner’s Building and first floor of PMC’s Elliot Building, as well as new construction of 9,300 square feet adjacent to PMC’s Miner’s
Building for Hospital support services, vestibule and canopy.

Project Location: Pikeville, Kentucky

More Details

Simpson County Justice Center – Water Infiltration Renovation

Simpson County Justice Center – Water Infiltration Renovation

Please Note: Addendum 01 has changed the Bid Date & waived the mandatory pre-bid!

PROJECT DESCRIPTION:
The Work of the Project consists generally of the
following:
Replacement of FRP and associated construction, replace of roof, and other related work
to address water infiltration issues, including emergency generator.

Project Location: Franklin, Kentucky

More Details

City of New Albany – 2018 Annual Street Paving and Repairs Project

City of New Albany – 2018 Annual Street Paving and Repairs Project

PROJECT DESCRIPTION:
The project consists of milling, pavement patching, pavement placement, curb ramp replacement, curb, sidewalk and driveway replacement, pavement striping, and other appurtenant work associated with pavement improvements to various streets throughout the city.

Project Location: New Albany, Indiana

More Details

5312 Alba Way Drainage Improvement Project

5312 Alba Way Drainage Improvement Project

Description and location of Project: This unit based construction order is for the paved ditch installation along the rear property line behind 5312 Alba Way in Metro Council District 2.

Project Location: Louisville, Kentucky

More Details

Hardin County Water District No. 1 – Sewer Main Rehabilitation Projects – Group B

Hardin County Water District No. 1 – Sewer Main Rehabilitation Projects – Group B

PROJECT DESCRIPTION:
Installation of approximately 4,100 L.F. of 30-inch gravity sewer, 8,100 L.F. of
16-inch force main, 1,780 L.F. of 8-inch force main, the rehabilitation of 15-inch gravity
lines and the installation of respective manholes.

Project Location: Radcliff, Kentucky

More Details

Murray-Calloway County Airport – LED Taxiway Lighting Project

Murray-Calloway County Airport – LED Taxiway Lighting Project

Addendum 1 has cancelled this bid.

PROJECT DESCRIPTION:
Furnishing all labor, materials and equipment and performing all work
necessary for LED Taxiway Lighting Project at the Murray-Calloway County Airport

Project Location: Murray, Kentucky

More Details

RFB-212-18 RE-ADVERTISEMENT OF RFB-24-18

RFB-212-18 RE-ADVERTISEMENT OF RFB-24-18

Project Manager Name: Frank Phillips
Phone: (502) 782-0331
Email:
frank.phillips@ky.gov


Estimate:
$314,975.00
Estimated Length of Project:
120 (Substantial Completion) + 30 (Final Completion)

The Commonwealth of Kentucky, Division of Engineering and Contract Administration (DECA) and the Department of Parks (Parks) is planning to replace the emergency spillway and raise the inlet of the principal spillway for the General Butler State Park Dam.
The concrete emergency spillway was constructed in 1939 by the Civilian Conservation Corps and is in an advanced state of structural distress. The proposed emergency spillway replacement will consist of demolition of the existing 10 foot by 3 foot reinforced concrete box culvert, concrete drop structure, three (3) 48-inch CMP’s and concrete headwall. The new emergency spillway will be a reinforced concrete structure consisting of a 12 foot by 4 foot box culvert through the embankment, discharging to a chute spillway and stilling basin on the downstream side of the embankment. The overall length of the new emergency spillway structure is 133 feet. The stilling basin will discharge to a riprap channel.
In conjunction with demolition of the emergency spillway, the CCC inscription on the culvert headwall on the upstream side of the dam shall be removed intact by saw cutting and the resultant slab preserved for display. The Contractor shall submit a plan prior to demolition, approved by the Design Team and General Butler personnel, for preservation of the concrete slab. The plan shall also include design of a pedestal to support the slab.
The principal spillway for the dam was replaced in 2014 and the new inlet which was installed lowered the previous normal pool elevation of the lake. The principal spillway structure inlet will be raised approximately 1.4 feet by addition of a precast or cast-in-place concrete collar to the existing structure. The inlet raise will return the pool elevation of the lake to previous levels. Raising the inlet will also require raising the existing catwalk and either replacing or extending the slide gate controls, the Contractor shall submit a plan for approval to accomplish this work. The existing principal outlet headwall will be demolished and replaced with a new impact basin discharging to a riprap channel.
Construction of the new emergency spillway will require a substantial excavation of the existing embankment and existing roadway. The entire length of the embankment will be receive new asphalt pavement consisting full depth replacement over the excavation area and overlays elsewhere.
The project requires removal and replacement of an existing wooden walkway located on the upstream side of the dam near the east abutment. The Contractor will be responsible for restoring the walkway to its current condition utilizing either salvaged existing or new materials. Any deviation from the current configuration will require prior approval by the Design Team and General Butler State Park personnel.
All slopes shall be regraded and disturbed areas will be seeded and mulched. Open areas of the new structures will receive fencing as shown on the Construction Drawings.

Project Location: Carroll

More Details

Bracken County Public Library – Renovation & Addition

Bracken County Public Library – Renovation & Addition

PROJECT DESCRIPTION:
The Project consists of the construction of a new 1,695 sf addition on a full cast-in-place concrete unfinished basement to the existing Library building, as well as renovated interior finishes and site improvements for the Bracken County Public Library. The project shall include, but not limited to, concrete slab on grade lower level accessible basement, poured reinforced concrete footings and foundation walls, concrete slab over metal decking and steel framed beams and floor joists at the main floor level, wood stud wall framing, wood roof trusses with plywood sheathing and standing seam metal roofing system. The work shall also include all of the related site work for excavation, building layout, temporary construction fencing & construction trailer; NOI, soil erosion control, excavation & fill, trench excavation, underground storm water drainage system, parking lot revision and replacement including
asphalt paving & striping of lot, concrete sidewalks, curb and sodding. Upgraded electrical systems, new dedicated HVAC systems, LED lighting, fire alarm and limited A/V equipment.

Project Location: Brooksville, Kentucky

More Details

LFUCG – Richmond Road Medians Corridors Landscape Project

LFUCG – Richmond Road Medians Corridors Landscape Project

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items as listed for the Richmond Road
Medians Corridors Landscape Project, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Berea Municipal Utilities – B-Lake Principal Spillway Repair

Berea Municipal Utilities – B-Lake Principal Spillway Repair

PROJECT DESCRIPTION:
The work to be bid is described as follows:

CONTRACT 344-17-04
Construction and repairs to an existing spillway retaining wall and grading,
drainage, and erosion control of a hillside slope above the retaining wall. The bids will
include all provisions of the Project, including all associated work necessary to provide
a finished product that meets the requirements set forth in the Contract Documents.

Project Location: Berea, Kentucky

More Details

CCK-2307-18 Facilities Renewal, Modernization & Deferred Maintenance – Infrastructure – 2446.3

CCK-2307-18 Facilities Renewal, Modernization & Deferred Maintenance – Infrastructure – 2446.3

Please Note: Addendum 01 has changed the Bid Date

PROJECT DESCRIPTION:
The Infrastructure project consists of replacing existing sanitary piping, existing steam piping, and a new chilled water system. The sanitary piping work will consist of replacing all of the
existing piping and manholes from Pence hall to the manhole outside of The Funkhouser
Building. This work will include adding new piping and manholes outside of Kastle Hall to tie
in to the other new work. The steam piping work will consist of replacing all of the piping and
valves around the Chemistry-Physics building extending to the vault by Bowman Hall and to
the vault by M.I King Library, removing and installing 1 new vault, and vault repair work. The
chilled water piping work will consist of installing a new chilled water service from the
entrance to Funkhouser drive to behind The Funkhouser Building and extending up Library
Drive.

Project Location: Lexington, Kentucky

More Details

LFUCG – Winchester at New Circle Interchange Corridors Landscape Project

LFUCG – Winchester at New Circle Interchange Corridors Landscape Project

PROJECT DESCRIPTION:
Consisting of the construction and/or furnishing of items for the Winchester at
New Circle Interchange Corridors Landscape Project, Lexington-Fayette County, Kentucky.

Project Location: Lexington, Kentucky

More Details

Newburg Community Center Renovation – 180186

Newburg Community Center Renovation – 180186

PROJECT DESCRIPTION:
Louisville Metro Government is currently accepting bids for Newburg Community Center
Renovations.
Renovation of approximately 3,000 square feet. Rooms to be renovated include restrooms,
corridors, and large multi-purpose room, and office.

Project Location: Louisville, Kentucky

More Details

CCK-2309-18 Expansion & Resurfacing of Various Parking Lots – 2491.0

CCK-2309-18 Expansion & Resurfacing of Various Parking Lots – 2491.0

PROJECT DESCRIPTION:
The project consists of the creation, expansion and/or resurfacing of six (6) asphalt parking
lots across campus. Three of the project sites are expansions of existing lots: The ADA lot at
the corner of Rose & Huguelet; the Scott Street lot and the lot behind the Craft
Center/Memorial Coliseum, where the outdoor Blue Basketball Courts (and most recently the
temporary Bookstore) were located. Two of the sites are currently gravel parking lots at the
corner of Elizabeth St and Transcript and on Transcript to the west of Press Ave. The final lot
will be constructed at the corner of Press and Leader Avenues. Demolition of existing
elements will be required at each site to differing degrees. Erosion control measures shall be
installed and maintained at each site throughout the duration of construction. Some earth
moving will be required on several of the lots. Concrete curb/gutter will border nearly all sides
of the parking lots and concrete sidewalks and driveway aprons will be required at most of the
lots. The Scott Street lot includes a concrete stair with stainless steel handrails and campus
standard bollards. All of the lots will be paved with asphalt and striped per UK’s standards.
Storm sewer improvements will be included at the ADA, Press Avenue, Elizbeth Street and
Scott Street lots. Lawns around all lots will be sodded and planting beds installed with
hardwood mulch, trees, shrubs and perennials. Lighting improvements will be included at the
ADA, Press Avenue, Scott Street and Blue Courts lots. The sites will be phased as follows:
Phase 1 will commence May 8 and include the ADA and Elizabeth Street lots; Phase 2 will
commence June 4 and include the Blue Courts, Scott Street and Transcript West*. Phase 3
will commence July 9 and will include the Press Avenue lot. All lots except Press Avenue
must be substantially completed by August 1*. (*Elizabeth Street must be completed before
Transcript West can commence.) Press Avenue must be substantially completed by
September 10, 2018.

Project Location: Lexington, Kentucky

More Details

City of Frankfort – Contract 2 Old Lawrenceburg Road Pump Station Replacement Project

City of Frankfort – Contract 2 Old Lawrenceburg Road Pump Station Replacement Project

PROJECT DESCRIPTION:
Project consists of abandoning the Old Lawrenceburg Road Pump Station and replacing it with a new pump station, with all related work

Project Location: Frankfort, Kentucky

More Details

Madison County Utilities District – Mountain View/Berkley Hall Water Line Loop

Madison County Utilities District – Mountain View/Berkley Hall Water Line Loop

PROJECT DESCRIPTION:
The work to be bid upon is described as follows:

Mountain View / Berkley Hall Water Line Loop

Construction of 1,760 LF of 6″ PVC Water Main, 1 Wet Tap Connection, 1 Dry Tap Connection, 24
LF of Freebore, 3 Gate Valves, 2 Bypass Meters w/ Gate Valve, 1 Air Relief Valve, 140 LF of Creek
Crossing, and other necessary items

Project Location: Richmond, Kentucky

More Details

18-59 / Bush Farm Road Grid Tie

18-59 / Bush Farm Road Grid Tie

Louisville Water Company is requesting Bids for Installation of 400 +/- LF of 12-inch PVC water pipe and appurtenances, all of the above made ready for use in accordance and compliance with the Contract Documents. Pipe and pipe appurtenances will be supplied by Louisville Water Company.

Project Location: Louisville, Kentucky

More Details

RFB-207-18 CHFS – WSH Main Hospital Building Exterior Upgrades

RFB-207-18 CHFS – WSH Main Hospital Building Exterior Upgrades

Project Manager Name: Dwayne
Brown
Phone: (502) 782-0315
Email: Dwayne.Brown@ky.gov


Estimate:
$408,854.00
Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

The project is the consists of exterior repairs for Western State Hospital, Building 59. Repair work involves the following:
1. Removal and replacement of Building 59 gutters and downspouts.
2. Repair, prep and paint deteriorated cement plaster, painted brick, wood cornice and soffit, wood frieze and soffit, metal flashing, dome wood base, dome base metal cladding, dome wood cupola, dome metal roof, and dome metal access ladder.
3. Removal and replacement of eight window sashes on dome.
4. Removal and replacement of twenty-four window units on north elevation of Building 59. Elevation access for labor, materials and equipment shall be through Building 48.

Project Location: Hopkinsville

More Details

Housing Authority of Russellville – Kitchen Upgrades

Housing Authority of Russellville – Kitchen Upgrades

PROJECT DESCRIPTION:
The project consists of:
Kitchen Upgrades

Project Location: Russellville, Kentucky

More Details

CCK-2308-18 Expand/Construct Orange Parking Lot Phase 4 – 2490.0

CCK-2308-18 Expand/Construct Orange Parking Lot Phase 4 – 2490.0

PROJECT DESCRIPTION:
The Work is located at Lexington, Kentucky, on the University of Kentucky campus along and parallel to Alumni Drive between Nicholasville Road and University Drive, and adjacent to the Gluck Equine Resource Center Parking Lot.

Major work items in this Contract include:

1. Earthwork
2. Parking lot with underground detention basin
3. Furnishing and installation of new storm sewer manholes
4. Furnishing and installation of 24-inch, 15-inch, and 12-inch storm sewers and accessories
5. Seeding
6. Removal of existing storm sewers and accessories, all sizes
7. Removal of parking lot lighting and accessories
8. Removal of curb and gutter, and modify drainage structures

Project Location: Lexington, Kentucky

More Details

Marshall County High School Renovation

Marshall County High School Renovation

PROJECT DESCRIPTION:
Project consists of the phased renovation of the existing Marshall County
High School and auxiliary buildings on campus. Renovations include but are not limited to major renovations of the central student commons, existing cafeteria, media center, restrooms and
expansion/renovation of the administration suite. Renovations also include modifications of existing building stair roof structures, replacement of the existing membrane and metal roofs, finishes upgrades and door and hardware replacement. The site scopes are concentrated around the administration expansion, new site lighting and alternates for overlaying the existing asphalt
parking lots. Mechanical, Electrical and Plumbing renovations include major electrical revisions
and sprinkler expansion. Plumbing associated with the restroom renovations and new science laboratory. This project will run in conjunction with a separate Energy Saving Contract that will address large portions of the Mechanical and Lighting renovations. Work will be required to coordinate and connect to these scopes of work. Refer to drawings for additional information.

 1. Project cost range is anticipated to be under $11 ,530,000.00.

Construction Contract: Bids will be received for the following Work

 1. General Contract (all trades).

Project Location: Benton, Kentucky

More Details

Northern Kentucky Water District – Fort Thomas Treatment Plant – Laboratory Standby Power

Northern Kentucky Water District – Fort Thomas Treatment Plant – Laboratory Standby Power

PROJECT DESCRIPTION:
The proposed Work is generally described as follows: Furnish and install 12,47DV
feeder from existing pad mounted sectionalizing switch to location of existing Dukeowned
transformer which currently serves the laboratory, and remove existing
secondary utility meter. Coordinate with Duke to remove existing transformer, and
furnish install new pad mounted transformer, 12,470V primary, 120/208V secondary.

Project Location: Fort Thomas, Kentucky

More Details

Nightingale Pump Station and CSO Storage Basin – Flow Meter Installation

Nightingale Pump Station and CSO Storage Basin – Flow Meter Installation

Description and location of Project: Install Flo-Dar meter as shown on Sheet 1 of 1 in accordance with Technical Specifications; Terminate power supply at the existing panel, PNL-L1, located in the RTC building, with a new dedicated 20 amp (120/240V Square D) single pole breaker; Connect the I/O to the existing RTC/PLC/NIGH control panel per MSD’s direction and Flo-Dar Wiring Detail; Mount NEMA 4 pull box to side of building, core drill existing wall for new conduit and seal opening per Flo-Dar Enclosure Mounting Detail; Install approximately 450 LF of concrete encased red dye conduit duct bank from the RTC building to the new Flo-Station Control Cabinet, PVC conduit below grade transition into conduit above grade, wiring schedule located on Sheet 1 of 1; Install approximately 100 LF conduit with Flo-Dar sensor cable to existing manhole, core manhole; Mount provided Flo-Dar sensor in existing manhole, provide stainless steel mounting hardware; Conduit exiting the RTC building shall lie above grade across sidewalk in the rear of the building in parallel with existing conduit through the fence; Contractor shall be responsible for all ground restoration in accordance with MSD’s Standard Specifications; Contractor will not be responsible for a test start-up of instrumentation; MSD will assume responsibility for commissioning the Flow Station and Flow Meter; MSD to provide Flow Station Installation Manual to awarded Contractor; Potential for large rock removal; Work shall be completed within 60 days from Notice to Proceed.

Project Location: Louisville, Kentucky

More Details

181011 Jefferson Co. Call 200

Kentucky Transportation Cabinet

CALL 200 CONTRACT ID 181011 JEFFERSON COUNTY 056GR18D011-NHPP IM I-64 JEFFERSON COUNTY NHPP IM 0642(197) : I-64 WIDEN I-64 WB RAMP TO I-264 WB FROM ONE TO TWO LANES FOR ENTIRE LENGTH AND OTHER NEEDED IMPROVEMENTS TO ADDRESS WEAVE ISSUES AT MERGE ON I-264, A DISTANCE OF 2.35 MILES. GRADE & DRAIN WITH BRIDGE. SYP NO. 05-00159.00. JEFFERSON COUNTY NHPP IM 0642(198) : I-64 JPC REPAIR AND DIAMOND GRIND ON I-64 FROM 0.129 MILE EAST OF KY-1932 (BRECKENRIDGE LANE)(MP 11.574) TO 0.412 MILE WEST OF OXMOOR AVE(MP 13.160) IN JEFFERSON COUNTY, A DISTANCE OF 1.60 MILES. JPC PAVEMENT REPAIRS – DIAMOND GRINDING. SYP NO. 05-02086.01.

PROJECT LOCATION: Jefferson County, Kentucky

More Details