Work is to include installation and construction of approximately 660 LF of 12 inch Ductile Iron
Gravity Sewer, 1,050 LF of 8″ & 10″ PVC gravity sewer, 640 LF of 18″ Steel Casing that includes a 12″ PVC carrier pipe and 2,030 LF of 6″ Force Main, 12 Concrete Manholes and the upgrade of 2 sewer lift
stations.
CCK-2633-22 2402.16 PAV A. 12th Floor Fit Up – Interiors
CCK-2633-22 2402.16 PAV A. 12th Floor Fit Up – Interiors
The UK 12th Floor Fit Out package includes the fit-out work for construction on the 12th floor of Pavilion A.
This work includes the construction of 64 ICU patient rooms, a pharmacy, auxiliary support spaces, and
installation of 2 owner provided air handler units.
City of Winchester – Town Branch Building Demolition
City of Winchester – Town Branch Building Demolition
The project scope includes demolition of the existing Building, located at 12 – 18 E. Broadway Street, and construction of
a poured retaining wall to support surrounding fill once building is removed.
The Lexington-Fayette Urban County Airport Board (LFUCAB) invites the submittal of
Proposals from professional firms interested in the refurbishment of the AVGAS bulk storage
tank at Blue Grass Airport.
This invitation is for renovation of the Giles Gallery as specified in the following bid at Eastern Kentucky University’s
Richmond Campus. The work includes furnishing all labor, materials, equipment and services necessary for the complete
project.
The project includes removal and replacement of three air handling units and new temperature controls at new air handling units. Electrical work incudes removal and replacement of existing switchboard and work associated with air handling replacements. Minor plumbing, fire protection and general construction associated with air handling unit replacements.
Mayfield-Graves County Airport – Apron Expansion Project
Mayfield-Graves County Airport – Apron Expansion Project
Project consists of furnishing all labor, materials and equipment and performing all work
necessary for Apron Expansion Project at the Mayfield-Graves County Airport.
City of New Albany – 2022 Annual Street Paving and Repairs Project
City of New Albany – 2022 Annual Street Paving and Repairs Project
The project consists of curb, curb ramp, sidewalk and driveway replacement, and other
appurtenant work associated with these improvements to various streets throughout the city.
Bourbon County Board of Education – Bourbon County Middle School Sensory Garden
Bourbon County Board of Education – Bourbon County Middle School Sensory Garden
The project scope includes new outdoor sensory garden space for the Bourbon
County Middle School Special Education Classroom. Project includes new poured in place surfacing,
artificial turf, a pre-engineered shade structure and playground equipment.
Kentucky River Foothills Development Council Inc. – Transit Center Office
Kentucky River Foothills Development Council Inc. – Transit Center Office
The project scope includes the development of a 2.5-acre site with the construction of two single story
buildings: a 13,976 square foot office building with type B occupancy, and a 3,962 square foot
maintenance garage with type S1 occupancy.
City of London – Levi Jackson Campground Sewer Pump Station Replacement Project
City of London – Levi Jackson Campground Sewer Pump Station Replacement Project
The project will include the installation of one (1) 150-GPM sanitary sewer duplex pump station and
valve vault, 60 LF of 8-inch PVC gravity sewer, construction of a gravel access drive, fencing,
excavation, and other associated appurtenances.
Lexington Public Library – Marksbury Family Branch
Lexington Public Library – Marksbury Family Branch
The Village Branch, a linchpin in LPL’s system wide vision, opened in 2004 as a small storefront
branch. Expanded in 2010, the Village Library routinely punches above its weight with program
attendance and circulation numbers far above what might be expected. The branch is a true
community asset, hosting many extra-library programs for the neighborhood, which has higher
walkability and lower incomes than other areas of Lexington. The Library’s 2019 Master
Planning process, with input from the Lexington community, identified the replacement of the
Village Branch as its top priority. In November 2020, LPL purchased the site the library currently
sits on with the vision to build a new 30,000 square ft. branch library
Sandy Hook Water District – Contract 13 – Water Main Replacement
Sandy Hook Water District – Contract 13 – Water Main Replacement
Contract13 – Water Main Replacement – The program of work for this project which bids are to be
submitted consists of the replacement of approximately 20,000 LF of 4”/6” PVC water main and the
reconnection of approximately thirty-eight (38) meter services. Also included is the interior resealing of the
Wrigley standpipe tank and new pumps and VFD’s for the KY 7 pump station.
Sandy Hook Water District – Contract 12 – New Water Treatment Plant & Improvements
Sandy Hook Water District – Contract 12 – New Water Treatment Plant & Improvements
Contract 12 – New Water Treatment Plant & Improvements – The program of work for which bids are to
be submitted consists of constructing a new approximately 4,600 square feet pre-engineered metal building
with interior rooms, CMU walls, three bays with overhead doors, chemical feed rooms, MCC electrical room,
three high service pumps and two backwash pumps, three 7-foot diameter pressure vessels with control
valves and piping, filter media and support gravel, utility and toilet area, overhead crane system, site
preparation, concrete backwash lagoons with pre-engineered metal canopy, stream restoration with gabion
baskets, two 40,000-gallon above-ground clearwell storage tanks, crushed stone paving, fencing,
emergency generator, on-site sewage disposal system with pumps, SCADA computer system, and all
associated appurtenances and miscellaneous items, including all other associated electrical, mechanical,
and structural work, including all related appurtenances, site clearing, site grading and improvements,
connections to existing utilities and other work for a complete installation,
This project includes demolition and removal of four wood frame pavilions and associated concrete slabs. New work includes installation of 4 new pre-finished steel pavilions and thermoplastic coated picnic tables. New concrete slabs will be installed. Pavilion designs are to be engineered by manufacturer with stamped and sealed drawings by a Kentucky engineer. After construction any site disturbances made during construction shall be returned to existing conditions prior to construction.
Clark-Floyd Landfill – West Perimeter Pipe Construction
Clark-Floyd Landfill – West Perimeter Pipe Construction
The project generally consists of:
The installation of the perimeter leachate collection piping and associated electrical controls around
the west portion of the landfill as shown on the plans. This includes the installation of seven (7)
sump pumps, approximately seven thousand (7,000) linear feet of leachate collection piping,
approximately seven thousand (7,000) linear feet of electrical conduit and all pumping, hauling and
disposing of leachate to allow installation of the items described.
This project consists of installation of new HVAC units to serve Racer Arena and associated electrical upgrades. Demolition work includes demolition of existing HVAC units, associated ductwork, steam piping, condensate piping, controls, and associated electrical. New work consists of HVAC units on structural support
stand, ductwork distribution, HVAC controls and electrical upgrades. Associated architectural work includes patching and painting existing walls and floors, and modifications to existing roof for new ductwork penetrations and structural steel supports.
The following alternates are included:
Alternate 1 – HVAC controls shall be integrated into the Owner’s existing BAS (Reliable Controls). The bid shall include all costs associated with the extension of the existing system and be in compliance with the specifications. As this is an extension of the existing BAS, the web-based server may be omitted if the existing
BAS allows
This project consists of installation of a new HVAC heating hot water system and domestic water heating
system to serve Racer Arena and Carr Hall, generator, and associated electrical upgrades. Demolition work
includes demolition of existing HVAC units, associated ductwork, steam piping, condensate piping, hydronic
piping, controls, and associated electrical. New work consists of hydronic piping, domestic water heaters,
heating hot water boilers, hydronic pumps, HVAC controls and electrical upgrades. Associated architectural
work includes construction of a new mechanical room, patching and painting of existing walls and floors, and
modifications to existing roof for new penetrations.
The following alternates are included:
Alternate Bid#1 – HVAC controls shall be integrated into the Owner’s existing BAS (Reliable Controls). The
bid shall include all costs associated with the extension of the existing system and be in compliance with the
specifications. As this is an extension of the existing BAS, the web-based server may be omitted if the existing
BAS allows.
Alternate Bid#2 – Per Base Bid, condensing boilers shall be an approved equal per Specification Section
235216 Condensing Boilers. Per Alternate Bid, condensing boilers shall be manufactured by RBI as
scheduled.
Alternate Bid#3 -Per Base Bid, hydronic pumps shall be and approved equal per Specification Section 232123
Hydronic Pumps. Per Alternate Bid, hydronic pumps shall be manufactured by Bell & Gossett as scheduled.
Alternate Bid#4 – Per Base Bid HVAC Water Treatment shall be an approved equal per Specification Section
232500 HVAC Water Treatment. Per Alternate Bid, HVAC Water Treatment shall be manufactured by RBI as
scheduled.
Alternate Bid#5 – Domestic Water Heaters shall be manufactured by NTI or approved equal as scheduled.
Alternate Bid#6 – Thermostatic Mixing Valve for Domestic Water shall be manufactured by Armstrong and the
“Brain” or approved equal as scheduled.
Alternate Bid#7 – Construction of exterior concrete ramp for vehicular access to floor level of Mechanical
Room. Also included is associated site work and metal railings.