Uncategorized

City of Somerset – Venture Way Sanitary Sewer Extension

City of Somerset – Venture Way Sanitary Sewer Extension

The primary scope of work includes the installation of approximately 348 LF of 8-inch gravity
sewer, four (4) sanitary sewer manholes, and related appurtenances.

Project Location: Somerset, Kentucky

More Details

CCK-2646-23 W.T. Young Library: Urethane Foam Roof Phase 1-REBID

CCK-2646-23 W.T. Young Library: Urethane Foam Roof Phase 1-REBID

Phase I is to install 1/2 of the roof system on W.T. Young Library. The work is to remove the
ballast from the existing EPDM roof-membrane, install a urethane coated SPFR system and
install the sleepers for a future roof-top work platform. The sleepers will be embedded into
the foam of the SPR system. The future work-platform is for maintenance-access to the
building Cupola and the Rotunda roof, exterior walls, built-in gutters, downspouts and
windows. The work platform is to be constructed on the perimeter of the large roof central skylight
system in order to accommodate a lift reaching to the top of the Rotunda. There is an
add alternate for Phase II, the second half and completion of the buildings foam roof system
with sleepers.

Project Location: Lexington, Kentucky

More Details

City of Flemingsburg – Contract 2 – Dorothy Street Water Line Replacement

City of Flemingsburg – Contract 2 – Dorothy Street Water Line Replacement

The program of work for Contract No. 2 which bids are to be submitted consists of the installation of
approximately 825 LF of 6” water main and appurtenances. Additionally, the project includes the
reconnection and replacement of approximately 15 existing service meters for the City of Flemingsburg Contract No.2 – Dorothy Street Water Line
Replacement Project.

Project Location: Flemingsburg, Kentucky

More Details

Housing Authority of Danville – Toombs Court & Latimer Heights Roof Replacement

Housing Authority of Danville – Toombs Court & Latimer Heights Roof Replacement

Work will include the following:

Capital Fund Program 2020/2021
HOUSING AUTHORITY OF DANVILLE
ROOF REPLACEMENT
AMP 101 Toombs Court – KY 14-06
AMP 201 Latimer Heights – KY 14-08

Project Location: Danville, Kentucky

More Details

City of Hartford – Water Storage Tank Renovation – (capacity reduction) 400,000 Gallons

City of Hartford – Water Storage Tank Renovation – (capacity reduction) 400,000 Gallons

The work to be bid is described as follows:

The primary scope of work includes the renovation of an existing water storage tank reducing the
existing capacity from 1MG to 400,000 gallons, including installation of mixing system.

Project Location: Hartford, Kentucky

More Details

RFB-21-23 Sam Wright AML HP Letcher County, KY

RFB-21-23 Sam Wright AML HP Letcher County, KY

Estimated Length of Project:
(Substantial Completion) + 90 Calendar Days (Final Completion)

The Sam Wright AML Reclamation Project, with project limits boundaries enclosing
approximately 1.4 acres, will create up to approximately 1.0 acre of disturbance. This project will address ground motion that is affecting the foundation curtain wall on the upslope side of the Wright residence, the structure of which was expanded following a previous AML (Emergency)
Project constructed at the site by OSMRE. A concrete gravity wall will be constructed on the uphill side of the residence. Class-II stone will then be placed between the top of the wall and the slope in order to ballast the toe of the slope above the new gravity wall. An 8” diameter pipe will extend from the retaining wall subdrain to a 2’ flat-bottom grass-lined ditch that will carry drainage captured by the retaining wall off the house seat along the path of an existing perimeter ditch. All excavated earthen material will be filled on the hillside below the residence. Prior to the placement of fill in this area, the exiting topsoil will be removed and set aside to be replaced
following the placement of the fill material. All disturbed areas at this site will be revegetated by means of the AML Standard Residential Seed Mixture.
The proposed reclamation action will not cause any disturbance to streams, forested
areas, individual trees, caves or cave-like features (including underground mine openings and/or workings). The strict implementation and enforcement of Sediment and Erosion Control Best Management Practices will prevent any significant amount of sediments disturbed by projectrelated activities from entering area streams.

Project Location: Letcher County

More Details

Town of Clarksville – Cottonwood Drive and Potters Lane Infrastructure Improvements

Town of Clarksville – Cottonwood Drive and Potters Lane Infrastructure Improvements

Click Here for Cottonwood Dr Sanitary Sewer Repl & Storm Sewer Imp Bid Proposal Updated Addendum 1 8-12-22

COTTONWOOD DRIVE SANITARY SEWER REPLACEMENT AND STORM SEWER
IMPROVEMENTS

This project involves the following:
• Installing approximately 3,550 LF of 8”- 15” gravity sanitary sewers
• Installing approximately 400 LF of 30” gravity sanitary sewers
• Installing approximately 880 LF of 12”- 18” storm sewers
• Associated sanitary laterals (65), manholes and curb inlets
• Rear yard easement work including re-establishing the easements by removing/
relocating fencing (1,350 LF), sheds and other landscaping features.
• Installing approximately 900 LF of Concrete “V” Ditch within the easement.
• Reconstruction of Cottonwood Drive roadway section

POTTERS LANE DRAINAGE AND ROADWAY IMPROVEMENTS

This project involves the following:
• Installing approximately 4,150 LF of various size storm pipe
• Installing a variety storm sewer structures, catch basins and yard inlets
• Reconstruction of the entrance to Wooded View Golf Course @ Greentree/Potters Lane
• Installation of approximately 3,030 LF of 10’- wide concrete Mixed Use path
• Installation of approximately 3,392 LF of 5’- wide concrete sidewalk
• Removal and replacement of approximately 1,700 SY of concrete driveway aprons
• Miscellaneous milling and resurfacing of asphalt pavement
• Miscellaneous striping, signage, and ground restoration

Project Location: Clarksville, Indiana

More Details

CCK-2645-23 Replace Medical Vacuum Pump

CCK-2645-23 Replace Medical Vacuum Pump

Replace Medical VAC system at Good Samaritan Hospital, including controls BACNET over
IP. To include purchasing and delivery of pump skid and all related work necessary for a
complete installation.

Project Location: Lexington, Kentucky

More Details

RFB-20-23 KCTCS – Glema Mahr Arts Center Roof Repairs – Madisonville CC

RFB-20-23 KCTCS – Glema Mahr Arts Center Roof Repairs – Madisonville CC

Estimate:
$990,000.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

1. The project consists of roof replacements at Glema Mahr Center for the Arts.
2. Roof Replacements:
a. Tear off existing roof assembly, sheet metal, metal counter flashings, and roof components as indicated. Install new rigid insulation, tapered insulation, metal components and 2-Ply SBS-Modified Bituminous Membrane system as indicated on the drawings.
b. Install new roof hatches.
c. Install new roof access ladders.
d. Clean & reseal masonry wall control joints as indicated

Project Location: Madisonville

More Details

Rowan County Board of Education – Baseball & Tennis Complex

Rowan County Board of Education – Baseball & Tennis Complex

This project includes a new baseball complex and tennis courts. The baseball
complex includes a new seeded infield and outfield with irrigation, dugouts, bullpens, bleachers, a
concessions and press box building with restrooms, and new site elements. The tennis courts will
include fencing, lighting, and site elements. Major systems include mechanical, plumbing, and
electrical.

Project Location: Morehead, Kentucky

More Details

RFB-18-23 WD – McDowell Center Moisture Remediation

RFB-18-23 WD – McDowell Center Moisture Remediation

Estimate:
$307,889.00

Estimated Length of Project:
December 15,2022 (Substantial Completion) + January 30, 2023 (Final Completion)

The Charles McDowell Center for the Blind was constructed in the early 1990s and has minimal upgrades to the building over the past 30 years. The First Floor of the East Wing contains 15 Dorm Rooms, support areas including Arts/Crafts, Study, Laundry, Nurse’s Station, Fitness Room, Offices, Lounge, Kitchen, and Cafeteria. During the spring of 2020, there was a mechanical failure within the building, resulting in the creation of an environment suitable for moisture retention and mold growth. The portion of the building where this occurred is an area of approximately 14,000 SF, in the residential portion (East Wing) of the building. The project scope covers mechanical, plumbing, and architectural rework to remedy existing issues and open the area back for occupancy again.

Project Location: Louisville

More Details

McCreary County Water District – Contract 37 – Fibrotex Sanitary Sewer Pump Station and Force Main

McCreary County Water District – Contract 37 – Fibrotex Sanitary Sewer Pump Station and Force Main

The project will include the installation of 6,375 LF of 8-inch PVC force
main, 180 LF of 8-inch PVC gravity sewer, 240 LF of 16-inch steel casing Pipe (directional bore), 3 sanitary
sewer manholes, one pump station and valve vault, one mag meter vault, demolition and installation of
a new screening system, and related appurtenances

Project Location: Whitley City, Kentucky

More Details

RFB-15-23 DJJ – Mayfield YDC Tornado Damage

RFB-15-23 DJJ – Mayfield YDC Tornado Damage

Estimate:
$414,544.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

Existing Equipment Garage Demolish and remove existing vinyl siding, metal trim and shingle roofing off of existing structure. Modify existing stud framing and sheathing, as required for new 12′-0″ x 7′-0″ overhead door and for (3) new 3′-0″ x 7′-0″ door openings as indicated on plans. Pour new footing, lay foundation and pour new floor slab for connector to adjoining Maintenance Shop. Top of floor slab to match Equipment Garage. Connector to be constructed of 2×4 wood stud framing with 5/8″ “zip board” sheathing and roof decking. Connector roof shall tie into gable end wall condition of new maintenance shop and be overbuilt on the existing Equipment Garage roof. Finish exterior of structure with new vinyl siding, metal fascia trim and shingle roof to match Maintenance Shop. Install new gutters and down spouts.
Maintenance Garage – Demolish and remove existing 4″ CMU starter/base block and anchor bolts around perimeter of existing 24′-0″ x 30′-0″ concrete floor slab. Existing floor slab to remain. Pour new footing, foundation and floor slab along east edge of slab for new 12′-0″ x 30′-0″ addition. New concrete slab finished elevation to match existing. Lay new 6″ CMU sill block around perimeter of original slab and epoxy in new wall anchors. New Shop to be constructed of 2×6 wood stud framing with 5/8″ “zip board” sheathing and pre-engineered wood trusses at 24″o.c. covered with 5/8″ “zip board” decking. Finish exterior of structure with new vinyl siding, metal fascia trim and shingle to roofing to match Maintenance Shop. Install new gutter and down spouts. Modify existing concrete sidewalk so as to allow accessibility per Building Code.
Lawn & Garden Storage – Demolish and remove all components of existing 24′-0″ x 32′-0″ Equipment Shed in their entirety. (Siding, framing, concrete slab, etc.) Pour concrete pier footings and floor slab for new 24′-0″ x 32′-0″ Pole Barn framed structure. Equipment Shed to be 20′-0″ x 24′-0″ and tool storage to be 12′-0″ x 24′-0″. Each area to be accessible with a 10′-0″ x 10′-0″ overhead door located on gable ends of structure as well as a 3′-0″ x 7′-0″ man door located along the southern wall. Finish exterior of structure with exposed fastener metal siding and roofing.

Project Location: Mayfield

More Details

Whitley County Board of Education – Whitley County High School Physical Education Addition & Renovation

Whitley County Board of Education – Whitley County High School Physical Education Addition & Renovation

The addition consists of an expansion to the Whitley County High School
Weight Lifting Room and renovations to the existing Weight Lifting Room and a new Training Room.
Work will include selective demolition of existing exterior wall and windows, finishes, mechanical
and electrical systems. The addition will be a masonry load bearing structure with metal beams and
deck, lightweight insulated concrete roof with a single-ply roof membrane, brick veneer, metal wall
panels, aluminum storefront systems and new site elements. Major systems include Mechanical,
Plumbing, Fire Protection, Electrical and Voice/Data.

Project Location: Williamsburg, Kentucky

More Details

Hite Creek Pole Barn Project

Hite Creek Pole Barn Project

Sealed Bids addressed to the Louisville and Jefferson County Metropolitan Sewer District, 700 West Liberty Street, Louisville, Kentucky 40203 for the construction of Hite Creek Pole Barn Project Contract No. 2022-031, Budget ID No. D22175, will be received at the office of MSD until 10:00 a.m., Local Time, Thursday, July 21, 2022, and will be publicly opened and read at that place and time. The public may attend the bid opening via teleconference call.

Description and location of Project: To install the new pole barn, foundation, and slab located at Hite Creek Water Quality Treatment Center. All work shall be done in accordance to MSD’s Standard Specifications.

There will be no pre-bid meeting held for this project.

The Engineer’s Construction Cost Estimate for this project is between $50,000.00 and $100,000.00.

The bid documents will be available on, Thursday, July 7, 2022, online at www.msdbids.com. The charge for each set of bid documents is outlined on the above-referenced web site.

Persons wishing to view the bid documents may do so online at www.msdbids.com or at the following locations: Builders Exchange of Louisville, Inc., 2300 Meadow Drive; Associated Builders & Contractors of Kentuckiana, 1810 Taylor Avenue; and F. W. Dodge, 1812 Taylor Avenue; all located in Louisville, Kentucky; and the Associated General Contractors of Kentucky, 2321 Fortune Drive, Suite 112, Lexington, Kentucky.

The Project Manager for this Invitation to Bid is Joseph Exely. All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer Beth A. Tanner at beth.tanner@louisvillemsd.org. Questions received less than two days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD’s Chief Engineer, David W. Johnson, P.E.

MSD SUPPLIER DIVERSITY MINORITY AND WOMAN BUSINESS ENTERPRISE PROGRAM POLICY AND PROCEDURES MANUAL (MBE/WBE PROGRAM) – FOR CONSTRUCTION CONTRACTS $150,000 AND GREATER for Minority Business Enterprise (MBE) and Woman Business Enterprise (WBE) subcontracting participation. Effective June 1, 2020, MSD has adopted and implemented the revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual, modifying the MBE and WBE participation goals on construction services and construction-related services, in accordance with the MSD Disparity Study (Study). The Study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program modified subcontracting goals are listed below:

If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to a certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate “GOOD FAITH EFFORTS” in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) – (see MSD MBE/WBE Program – Construction Subcontracting Goal Documents and Forms at http://louisvillemsd.org/SupplierDiversity/forms).

All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD’s Procurement Buyer, Beth A. Tanner at beth.tanner@louisvillemsd.org. Due to the current Coronavirus (COVID-19) pandemic measures, MSD will be hosting a Teleconference call in the place of a face-to-face public opening. MSD will also post the As-Read Bid Summary as soon as available. To take part in the Bid Opening Teleconference Call, please call 502-654-8113 and enter code 752 015 86#.

MSD SUPPLIER DIVERSITY PROGRAM: Not Applicable

The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If applicable, the goals are as follows:

18.0% MBE – African American, 2.0% MBE – Asian-Indian American and

15.0% WBE – Caucasian Female participation respectively required for this project.

MSD BID DISCOUNT: Applicable

This MSD construction project is bid and advertised as: check applicable below

Construction Services: X
Construction-related Services:

LOCAL LABOR COMMITMENT PREFERENCE: No

COMMUNITY BENEFITS PROGRAM: No

The contract will be awarded on the basis of the lowest, responsive, responsible bid, subject to the approval of the MSD Board. MSD reserves the right to reject any or all bids or waive any informality in any bid.

MBE and WBE businesses are encouraged to bid on this project as a prime contractor.

LOUISVILLE AND JEFFERSON COUNTY

METROPOLITAN SEWER DISTRICT

David Johnson, P.E.
Chief Engineer

Rene’ Lindsay, CPPO
One Water Chief Procurement Officer

Project Location: Louisville, KY

More Details

Hardin County Water District No 1 – Pirtle Spring WTP, Gray Lane Pump Station, and Brizendine Booster Station Improvements

Hardin County Water District No 1 – Pirtle Spring WTP, Gray Lane Pump Station, and Brizendine Booster Station Improvements

Sealed bids will be received by the Hardin County Water District No. 1 for the project named Pirtle Spring Water Treatment Plant, Gray Lane Pump Station, and Brizendine Booster Station Improvements in Hardin County, KY

Project Location: Radcliff, Kentucky

More Details

Montgomery County Schools – Montgomery County High School – Secure Entrance

Montgomery County Schools – Montgomery County High School – Secure Entrance

The Work consists of construction of a new egress corridor requiring
minor renovations to the ceiling, flooring, doors, and painting at Montgomery County High School; and construction of a new secure entrance with minor renovations of flooring, ceilings, aluminum storefront and doors.

The Work includes, but is not limited to selective demolition, cast-in-place concrete, unit masonry, metal fabrications, joint sealants, aluminum framed entrances and storefronts, glazing, resilient flooring, painting, signs, protective covers and clean-up and removal of construction debris.

Project Location: Mt. Sterling, Kentucky

More Details

Montgomery County Schools – New Chenault Ag Facility

Montgomery County Schools – New Chenault Ag Facility

The Work consists of constructing a new 19,390 sq ft pole barn structure
to replace the building damaged by wind.

The Work includes, but is not limited to selective demolition, site clearing, termite control, subdrainage, fabrications, architectural woodwork, metal building insulation, soffits, joint sealants, metal doors, overhead coiling doors, aluminum windows, door hardware, glazing, gypsum board assemblies, acoustical panel ceilings, resilient wall base and accessories, painting, high-performance coatings, visual display boards, toilet compartments, signs, fire protection specialties, toilet and bath accessories, metal building systems, pre-engineered wood building system plumbing, HVAC, electrical (power, communication, and lighting) systems, electronic
safety and security, and complete clean-up and removal of construction debris.

Project Location: Mt. Sterling, Kentucky

More Details

CCK-2644-23 Nursing Steam Vault Renovation

CCK-2644-23 Nursing Steam Vault Renovation

This project will provide needed structural repairs to the steam vault behind the Nursing
Building. This includes installation of steel supports and repairs of deteriorated concrete.
The contractor is responsible for providing the required inspections and reports through an
independent testing laboratory.

Project Location: Lexington, Kentucky

More Details

RFB-16-23 DOC – KCPC New Captain’s Office

RFB-16-23 DOC – KCPC New Captain’s Office

Estimate:
$734,965.00

Estimated Length of Project:
180 (Substantial Completion) + 30 (Final Completion)

Construction of a new Captain’s office to replace the existing captain’s office in the secured yard of
the Kentucky Correctional Psychiatric Center in LaGrange Kentucky.
The structure is cast in place concrete with security window glazing in Hollow Metal Frames and SBS Bitumen
roofing. The interior often facility; insulated stud walls with a rigid vinyl covering, custom casework, acoustical ceilings, resinous epoxy flooring and base, HVAC cassette unit, 2 x 2 lighting and office furnishings.
Demolition of the existing building
Site work includes minor grading, building infill after demolition and new sidewalk around the new facility and
where the existing building is demolished.

Project Location: LaGrange

More Details

Breathitt County Board of Education – Training Facility

Breathitt County Board of Education – Training Facility

Work of the Project consists of all aspects of construction of 5,000 sf pre-engineered metal building with
attendant site work and basic mechanical, electrical and plumbing items. Also included are several
alternates including those for sports equipment (batting cages, flooring), an HVAC upgrade to the
proposed basic system and buildout of single occupant restrooms, janitor closet and sewer extension.

Project Location: Jackson, Kentucky

More Details

Cumberland Falls Highway Water District – Whitley County High School Waterline Extension

Cumberland Falls Highway Water District – Whitley County High School Waterline Extension

This contract consists of installing approximately 2,700 L.F. of
6” PVC, SDR-21 waterline and all other necessary appurtenances.
The
engineer’s estimate is $122,300.

Project Location: Corbin, Kentucky

More Details

Cumberland Falls Highway Water District – US 25 West Major Widening Waterline Relocation

Cumberland Falls Highway Water District – US 25 West Major Widening Waterline Relocation

This contract consists of relocating 750 L.F. of 8” waterline, an
underground pump station, and all necessary appurtenances.
The engineer’s
estimate is $93,500.

Project Location: Corbin, Kentucky

More Details

WKU-10332 Softball Soccer Indoor Training Facility

WKU-10332 Softball Soccer Indoor Training Facility

This project is a new softball and soccer indoor training facility. This 11,000 square foot building will sit
on the existing asphalt parking lot and adjacent lawn immediately south of the soccer field. The
building consists of a training space and locker room/office space. The training portion will consist of
a pre-engineered metal building type, while the locker room/office space is constructed with load
load-bearing masonry exterior.

Project Location: Bowling Green, Kentucky

More Details

Russell Independent Board of Education – Russell High School Restrooms

Russell Independent Board of Education – Russell High School Restrooms

Project consists of furnishing the specified labor, materials, supplies, tools, and or services, indicated for the:
Russell Independent High School Restrooms.

Project Location: Russell, Kentucky

More Details

Subscribe