RFB-130-25 EDU – KSB Ritchie Hall Building Improvements
RFB-130-25 EDU – KSB Ritchie Hall Building Improvements
Estimate:
$216,800.00
Estimated Length of Project:
4/15/2025 (Substantial Completion) + 4/30/2025 (Final Completion)
Project Description:
Existing theatrical and house lighting shall be demolished. The existing dimming banks and patch panel are to be demolished. The existing controls and entry button stations shall be demolished. Phase dim control interfaces shall be demolished.
New LED lighting will be provided throughout the auditorium for the house and stage areas. This includes various theatrical production lighting fixtures and suspended downlights. House downlights will be 0-10v dimmable, providing wires to the signal processing enclosure. A new DMX distribution controls infrastructure shall be provided for each lighting position. New control stations shall be provided for house lighting, with locations at the auditorium entry points. There also will be a touchscreen control station on stage to recall stage presets and manually adjust house lighting. A new lighting control console will also be provided at the new control booth.
Project Location: Louisville