The Project includes the following Work:
Construction of a new Wastewater Treatment Plant (WWTP) with an average capacity of 2.3 million
gallons per day (MGD) and a peak capacity of 7.0 MGD. The new WWTP will include a preliminary
treatment facility, oxidation ditch, chemical feed building, secondary clarifiers, RAS/WAS pump
station, peracetic acid contact basin, cascade aeration, sludge concentration basins, sludge holding
tanks, administration building, and related site and piping work.
Project Location: Shelbyville, Kentucky