Lynn Imaging Planroom

Logo

Owensboro Riverfront Pedestrian Pier Project Rebid

Order

Owensboro Riverfront Pedestrian Pier Project Rebid

Contact

Company Contact

Cornerstone Engineering Inc.
Chella Subran
Location

Location

Owenboro, Kentucky

Pre-Bid Information

Pre-Bid Information

10/01/2013 10:00 AM
A mandatory pre-bid meeting is scheduled for October 1, 2013 at 10:00 a.m. local time. Meeting will be held at the Public Works Office of the City of Owensboro at 1410 West 5th Street, Owensboro, KY 42301.
Bid Information

Bid Information

10/17/2013 02:00 PM CT

Description

Description

Please note the bid date has changed.

This project will include the rehabilitation of the remaining structure of the former Showroom Lounge on the Kentucky bank of the Ohio River in Owensboro, KY. Among other improvements, the project will include the following construction items:
a. Demolition of several existing walkways around the pier
b. Demolition and re-building of the existing concrete pier abutment
c. Installation of a new concrete topping slab
d. Strengthening and/or repair of the exiting steel structure
e. Installation of lighting improvements and decorative guardrails
f. Installation of rip rap for bank stabilization and debris removal (if selected as Additive Alternate)
g. Installation of aluminum decorative coping around the existing pier (if selected as Additive Alternates)
h. Installation of cast-in-place concrete caps on existing dolphins (if selected as Additive Alternates)

Job Purchase Information:

A complete set of plans and specs are available for a purchase of $95.00 payable to Lynn Imaging. Sets may be ordered through this website by using a Credit Card or Lynn Account.

There will be a $22.00 shipping charge for each set shipped UPS Ground payable to Lynn Imaging. Delivery surcharges are subject to change. There will be an $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS).

Mail checks to Lynn Imaging, Att: Distribution, 11460 Bluegrass Parkway, Louisville, Ky 40299.

Addenda

  • 10/03/2013 - Addendum No. 1 emailed and posted 10.3.2013
  • 10/16/2013 - Addenda No. 2 emailed and posted 10.16.2013