Description
The project is intended to upgrade the lighting in Parking Structure #2 to enhance the safety of the occupants and reduce operational costs. The construction documents were developed after a professional study that analyzed existing infrastructure conditions, surveyed lighting conditions in the existing garage, completed lighting calculations, generated payback analysis and surveyed currently available lighting products. The existing HID Metal Halide fixtures will be replaced with LED units that will enhance the energy savings and long fixture life which creates a favorable payback return on investment. The controls on the fixture will be modernized to include occupancy sensors to further reduce energy costs in the upper levels of the parking garage.