Description
1. Install approximately 300 feet of 6” condensate return piping, the entire length of the Peterson Service Building Utility Tunnel. This includes connections and full sized valves at both ends plus a tie in with the existing 2” condensate return piping exiting the Peterson Service Building.
2. Supply and replace the existing condensate receiver tank built to original specifications, dimensions and thickness with the4 exact opening locations so that all new and existing piping can be reused.