Pre-Bid Information
11/01/2012 02:00 PM ET
St Peter Claver Catholic Church
St Martin DePorres
410 Jefferson Street
Lexington, KY
Description
Bid Date changed to 11.27.2012
Please Note - General Bidders are by Invitation Only. The Invited General Contractors are:
1) Abel Construction
2) Hawkins Construction
3) The Hayden Company
4) JMBA Inc
5) Jarboe Construction
6) Walker Construction
The project consists of addition and renovations to the St. Martin DePorres Building on the campus of St Peter Claver Catholic Church at 410 Jefferson Street in Lexington. This will generally include, but not be limited to the following scope of work:
Structure demolition and selective demolition
Site clearing, earthwork, asphalt and concrete paving, storm sewerage, landscaping
Unit masonry assemblies, masonry restoration, water repellent treatment
Steel joists, metal floor decking, cold formed metal framing; pipe and tube railings
Wood trusses, finish carpentry, architectural woodwork
Waterproofing, damproofing, building insulation systems, asphalt shingles, flashing and sheet metal, fire stopping and sealants
Steel doors and frames, wood doors, access panels, overhead coiling shutters, aluminum entrances, wood metal clab windows, door hardware, glazing
Gypsum board assemblies, tile, acoustical ceilings, resilient flooring, carpet, painting, wallcovering
Toilet partitions, louvers, signs, fire protection specialties, operable partitions, toilet accessories
Food facilities equipment
Hydraulic elevators
Mechanical systems, plumbing fixtures, HVAC equipment, air distribution, temperature controls
Wiring devices, panel boards, interior lighting, fire alarm