Pre-Bid Information
06/28/2012 03:00 PM
Pre-Bid conference will be held at the Board Office.,br> 1600 West Lexington Ave,br>
Winchester,Ky 40391
Description
This project consists of the construction of an Area Technology Center built onto the Clark Co High School that is currently under construction. The new Area Technology Center will be approximately 41,000 SF. The building will contain standard classrooms and specialized lab spaces for Automotive, Welding, Health, Information Technology and Industrial Maintenance. The building is a one-story building with double height spaces for labs. Walls consist of CMU load-bearing construction with natural limestone and brick veneer. The roof will be a single ply thermoplastic roof system over lightweight concrete. Interior finishes include painted CMU and gypsum board; ceramic tile, terrazzo, lay-in accoustical ceiling. The HVAC system will be tied into the existing geothermal well field.
Job Purchase Information:
A complete set of plans and specifications is available for a refundable deposit of $200.00 payable to RossTarrant Architects for the first set. We must receive a check for this amount.
Additional sets are a non-refundable purchase of $200.00, payable to RossTarrant Architects, we must receive a check for this amount.
There will be a $28.00 shipping charge for each set shipped UPS Ground. There will be a $9.00 handling fee for the use of shipper numbers (Fed-Ex or UPS). Please note we only ship Fed-Ex on a customer's shipper number.
Delivery surcharges are subject to change.
Mail checks to Lynn Imaging, Attn: Distribution, 328 Old Vine Street, Lexington KY 40507.